Enbridge Pipelines (NW) Inc. - S20P-003
Status:
Issued
Authorization:
Land Use Permit
Activity:
Pipeline
Start:
September 17, 2020
Expiry:
September 16, 2025
Staff:
Bonnie Bergsma
Enbridge Pipelines (NW) Inc. (Enbridge) is proposing to replace a segment of the Line 21 pipeline southeast of kilometre post (KP) 158 near Little Smith Creek in the Northwest Territories (NWT). A Permit (S20P-003) is required for the use of land for camps, laydown yard, barge landing and temporary workspace, fuel storage, use of heavy equipment and a Licence (S20L1-001) for use of water and waste disposal.
Documents
- All Issuances (4)
- Annual Reports (2)
- Application and Related Docs (14)
- Assorted Management Plans (6)
- Consultations - Reviews - Work Plans (4)
- Engagement Plan (1)
- Final Closure and Reclamation Plan (2)
- Inspection Reports (9)
- Operations and Notifications (4)
- Preliminary Screening (1)
- Security and Water Use Fees (1)
- Shapefiles (1)
- Spill - Contingency - Emergency Response (2)
- Waste Management Plan (2)
Displaying 1 - 53 of 53
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Enbridge NW Response to GNWT Comments - Jun 16_23.pdf (153 KB) | ||
S20P-003 - Enbridge Line 21 - Land Use Permit Cover Page - Sep 17_20.pdf (4.35 MB) | ||
S20P-003 - Enbridge Line 21 Pipeline KP158 - Decision Letter - Sep 17_20.pdf (994.76 KB) | ||
S20P-003 - Enbridge Line 21 - Reasons for Decision - Sep 17_20.pdf (847.77 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Security Deposit Confirmation - Dec 18_20.pdf (80.56 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Enbridge EPP v. 1.1 - Staff Report - Dec 22_20.pdf (800.51 KB) | ||
S20P-003 -Enbridge Line 21 Replacement - KP158 - Staff Report - Aug 28 - Sep 17_20.pdf (2.88 MB) | ||
S20P-003 -Enbridge Line 21 Review Comment Table and attached correspondence - Sep 17_20.pdf (1.52 MB) | ||
S20P-003 - Enbridge Line 21 Pipeline Replacement Project - Staff Report - Aug -27_20.pdf.pdf (5.35 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Enbridge Line 21 - Preliminary Screening RFD - Aug 28_20.pdf (3.91 MB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Annual Water Licence Report - Mar 31_21.pdf (830.93 KB) | ||
S20P-003 - Annual Report Cover Letter - Mar 31_21.pdf (92.18 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Inspection Report - Jun16_23.pdf (514.4 KB) | ||
S20P-003 - Inspection Report - March21_23.pdf (1.9 MB) | ||
S20P-003 - Inspection Report - Feb22_23.pdf (1.51 MB) | ||
S20P-003 - Inspection Report - June-27-2022.pdf (951.01 KB) | ||
S20P-003 - Inspection Report - Feb 10_22.pdf (4.17 MB) | ||
S20P-003 - Inspection Report - May 7_21.pdf (2.73 MB) | ||
S20P-003 - Fuel-Cache Letter - Mar 29_21.pdf (487.15 KB) | ||
S20P-003 - Inspection Report - Mar 16_21.pdf (1.48 MB) | ||
S20P-003 - Inspection Report - Feb 26_21.pdf (6.81 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Condition 8 - notification of clean up and departure - Mar 9_21.pdf (198.51 KB) | ||
S20P-003 - KP158 - Project Contact List - Jan 11_21.pdf (90.43 KB) | ||
S20P-003 - YK STF Acceptance Letter - KBL Waste Facility - Jan 22_21.pdf (307.63 KB) | ||
S20P-003 - Drill Targets Location Map - condition 4 - Dec 10_20.pdf (1.74 MB) |
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Enbridge - EEP Decision Letter - Dec 23_20.pdf (264.53 KB) | ||
S20P-003 - Condition 69 - Revised Environmental Protection Permit version 1.1 - Dec 15_20.pdf (14.18 MB) | ||
S20P-003 - Letter to SLWB re Little Smith Creek Condition 69 of Land Use Permit.pdf (21.78 KB) | ||
S20P-003 - Environmental Protection Plan Version 1.1 - Dec 15_20.pdf (14.18 MB) | ||
S20P-003 - Cover Letter - Environmental Protection Plan - Nov 24_20.pdf (24.74 KB) | ||
S20P-003 - Environmental Protection Plan - Nov 24_20.pdf (16.47 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Appendix 8 - Engagement Plan and Summary - Jun 30_20.pdf (13.63 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Appendix 4 - Revised Spill Contingency Plan - Jul 17_20.pdf (4.58 MB) | ||
S20P-003 - Appendix 4 - Spill Contingency Plan - Jun 30_20.pdf (4.98 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Waste Management Plan Version 1.1 - Sep 10_20.pdf (7.24 MB) | ||
S20P-003 - Appendix 6 - Waste Management Plan - Jun 30_20.pdf (2.82 MB) |
8. Closure and Reclamation
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Closure and Reclamation Plan - Version 1.1 -Sep 10_20.pdf (5.69 MB) | ||
S20P-003 - Appendix 5 - Closure and Reclamation Plan - Jun 30_20.pdf (6.51 MB) |
9. GIS Data
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Appendix 2 - Shapefiles KP158 - Jul 17_20.zip (377.92 KB) |