Skip to main content

Enbridge Pipelines (NW) Inc. - S20P-003

​Enbridge Pipelines (NW) Inc. (Enbridge) is proposing to replace a segment of the Line 21 pipeline southeast of kilometre post (KP) 158 near Little Smith Creek in the Northwest Territories (NWT). A Permit (S20P-003) is required for the use of land for camps, laydown yard, barge landing and temporary workspace, fuel storage, use of heavy equipment and a Licence (S20L1-001) for use of water and waste disposal.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 9 of 9
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
S20P-003 - Inspection Report - Jun16_23.pdf (514.4 KB)
S20P-003 - Inspection Report - March21_23.pdf (1.9 MB)
S20P-003 - Inspection Report - Feb22_23.pdf (1.51 MB)
S20P-003 - Inspection Report - June-27-2022.pdf (951.01 KB)
S20P-003 - Inspection Report - Feb 10_22.pdf (4.17 MB)
S20P-003 - Inspection Report - May 7_21.pdf (2.73 MB)
S20P-003 - Fuel-Cache Letter - Mar 29_21.pdf (487.15 KB)
S20P-003 - Inspection Report - Mar 16_21.pdf (1.48 MB)
S20P-003 - Inspection Report - Feb 26_21.pdf (6.81 MB)