Canadian Zinc Corporation - MV2021L2-0004
Allied Permit: MV2021D0005
To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.
Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.
Documents
- AEMP - Program (14)
- All Issuances (5)
- Annual Reports (11)
- Application and Related Docs (120)
- Assorted Management Plans (3)
- Conceptual Closure and Reclamation Plan (6)
- Consultations - Reviews - Work Plans (15)
- Designs and As-Builts (9)
- Engagement Plan (5)
- Inspection Reports (8)
- Interim Closure and Reclamation Plan (16)
- Operations and Notifications (4)
- Preliminary Screening (7)
- Progressive Reclamation (1)
- Public Hearing (31)
- Security and Water Use Fees (9)
- Shapefiles (1)
- SNP Program (2)
- SNP Reports (58)
- Spill - Contingency - Emergency Response (1)
- Spill Reports (2)
- Technical Session (12)
- Waste Management Plan (1)
- Waste Rock and Tailings Management (1)
- Water Management (11)
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Mineral Exploration - EP V1 - Jul21-20.pdf (1.63 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Mineral Exploration - SCP V2 - Sep23-20.pdf (9.25 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Mineral Exploration - WMP V2 - Aug18-20.pdf (859.27 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Mineral Exploration - GVP V2.2.pdf (1020.79 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN – Extension Request - CRP Work Plan Version 1.1 - Approved - Mar11_25.pdf (176.37 KB) | ||
CZN – Extension Request - CRP Work Plan Version 1.1 - Review Comment Table - Mar10_25.pdf (138.19 KB) | ||
MV2021L2-0004 - CRP Workplan V1.1 - Extension Request - Jan31_25.pdf (620.18 KB) | ||
MV2021L2-0004 – Canadian Zinc Corporation – Not Approved – CRP Work Plan V1 - Aug26_24.pdf (543.81 KB) | ||
CZN - Closure and Reclamation - Work Plan V1 - Mar12_24.pdf (409.33 KB) | ||
CZN - Closure and Reclamation Plan Work Plan - Extension Request - Jul5_23.pdf (160.23 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - 2024 Progressive Reclamation - Notification - None Occurring - Mar12_24.pdf (118.39 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Type A Licence and Permit Application - GIS Shapefiles Prairie Creek - May27_21.zip (507.32 KB) |