Canadian Zinc Corporation - MV2021L2-0004
Allied Permit: MV2021D0005
To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.
Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.
Documents
- AEMP - Program (12)
- All Issuances (5)
- Annual Reports (8)
- Application and Related Docs (114)
- Assorted Management Plans (2)
- Conceptual Closure and Reclamation Plan (1)
- Consultations - Reviews - Work Plans (15)
- Designs and As-Builts (9)
- Engagement Plan (5)
- Inspection Reports (4)
- Interim Closure and Reclamation Plan (15)
- Operations and Notifications (2)
- Preliminary Screening (7)
- Progressive Reclamation (1)
- Public Hearing (31)
- Security and Water Use Fees (7)
- Shapefiles (1)
- SNP Program (2)
- SNP Reports (19)
- Spill - Contingency - Emergency Response (1)
- Technical Session (12)
- Waste Management Plan (1)
- Waste Rock and Tailings Management (1)
- Water Management (11)
Document | Received/Sent | Uploaded |
---|---|---|
CZN - 2022 Annual Report - 3-4 pH vs Colourimetric Zn - May 19_23.xlsx (33.55 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Geotechnical Inspection Requirements - Correspondence - Dec5_23.pdf (234.13 KB) | ||
CZN - Flood Protection Berm and Water Storage Pond - 2023 Annual Geotechnical Inspection - Nov22_23.pdf (56.56 MB) | ||
CZN - Inspection Report - Apr28_23.pdf (2.71 MB) | ||
CZN - Flood Protection Berm and Water Storage Pond - 2022 Annual Geotechnical Inspection - Mar 29_23.pdf (32.8 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - 2024 Site Opening Notification - Mar15_24.pdf (104.85 KB) | ||
CZN - Annual Review Condition - Mar1_23.pdf (163.33 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Annual Management Plan Review - 2024 - March12_24.pdf (155.96 KB) | ||
CZN - Type A Licence and Permit - Submission Requirements - Oct17_22.pdf (143.68 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN – Approved - Engagement Plan V2 - Apr26_23.pdf (183.24 KB) | ||
CZN - Engagement Plan - Version 2 - Mar 2_23.pdf (1.16 MB) | ||
CZN - Engagement Plan V2 - Incomplete - Jan10_23.pdf (177.52 KB) | ||
CZN - Engagement Plan V2 - Incomplete Conformity Review - Jan10_23.pdf (84.21 KB) | ||
CZN - Mineral Exploration - EP V1 - July 21-20.pdf (1.63 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Mineral Exploration - SCP V2 - Sept23-20.pdf (9.25 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Mineral Exploration - WMP V2 - Aug18-20.pdf (859.27 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Mineral Exploration - GVP V2.2 - Sept25-20.pdf (1020.79 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Closure and Reclamation - Work Plan V1 - Mar12_24.pdf (409.33 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - 2024 Progressive Reclamation - Notification - None Occurring - Mar12_24.pdf (118.39 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Type A Licence and Permit Application - GIS Shapefiles Prairie Creek - May 27_21.zip (507.32 KB) |