Canadian Zinc Corporation - MV2021L2-0004
Allied Permit: MV2021D0005
To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.
Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.
Documents
- AEMP - Program (14)
- All Issuances (5)
- Annual Reports (11)
- Application and Related Docs (120)
- Assorted Management Plans (3)
- Conceptual Closure and Reclamation Plan (6)
- Consultations - Reviews - Work Plans (15)
- Designs and As-Builts (9)
- Engagement Plan (5)
- Inspection Reports (8)
- Interim Closure and Reclamation Plan (16)
- Operations and Notifications (4)
- Preliminary Screening (7)
- Progressive Reclamation (1)
- Public Hearing (31)
- Security and Water Use Fees (9)
- Shapefiles (1)
- SNP Program (2)
- SNP Reports (58)
- Spill - Contingency - Emergency Response (1)
- Spill Reports (2)
- Technical Session (12)
- Waste Management Plan (1)
- Waste Rock and Tailings Management (1)
- Water Management (11)
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Memo Re Copper and Mercury Predictions - Oct13_21.pdf (182.42 KB) | ||
CZN - Technical Session - ECCC Response to IR5 - Oct4_21.pdf (259.57 KB) | ||
CZN - Technical Session - Responses to IRs - Sep20_21.pdf (10.69 MB) | ||
CZN - Technical Session - CZN Extension Request for IR Responses - Sep17_21.pdf (165.17 KB) | ||
CZN - Technical Session - Transript Day 1 (Aug.31) - Sep9_21.pdf (1.9 MB) | ||
CZN - Technical Session - Transcript Day 2 (Sept.1) - Sep9_21.pdf (1.84 MB) | ||
CZN - Technical Session - Transcript Day 3 (Sept.3) - Sep9_21.pdf (1.7 MB) | ||
CZN - Technical Session - Information Request ECCC - Sep7_21.pdf (180.91 KB) | ||
CZN - Technical Session - Information Requests - Sep7_21.pdf (266.4 KB) | ||
CZN - Technical Session - Correspondence Re Eligibility - Sep2_21.pdf (238.1 KB) | ||
CZN - Technical Session Presentation - Aug31_21.pdf (32.51 MB) | ||
CZN - Technical Session Agenda Aug 31 - Sept 2 - Aug27_21.pdf (337.31 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Prairie Creek Mine - Amendment - Work Plan V1 - Mar25_25.pdf (225.47 KB) | ||
MV2021L4-0004 - CZN - Amendment - Water Use Receipt - Feb17_25.pdf (58.71 KB) | ||
CZN - Prairie Creek Mine - Amendment - Work Plan - CZN Comments - Mar7_25.pdf (91.59 KB) | ||
CZN - Receipt - Amendment Fee - Feb17_25.pdf (39.56 KB) | ||
CZN - Prairie Creek Mine - Amendment - Work Plan - Draft.pdf (225.71 KB) | ||
CZN - Prairie Creek Mine - Amendment Application - Feb11_25.pdf (730.64 KB) | ||
CZN – Approval - Schedule 6 Change - Dec21_23.pdf (1.27 MB) | ||
CZN - Type A Mining and Milling - Licence - Updated Schedule 6 - draft.docx (537.63 KB) |