CIRNAC-CARD - W2020L8-0003
Status:
Issued
Authorization:
Licence
Activity:
Miscellaneous
Start:
November 18, 2021
Expiry:
November 17, 2031
Staff:
Anneli Jokela
This Licence entitles the Licensee to use Water and deposit Waste for remediation activities at the Rayrock Remediation Project in the area as described in the Type A Water Licence Application submitted September 21, 2020. The scope of this Licence includes the following:
a) Blasting, quarrying, and drilling activities for remediation activities; removal andshipping or burial of hazardous and non-hazardous waste in the ConfinedDisposal Facility; maintenance of Tailings Containment Areas andDecommissioned Waste Dump; Sherman Lake dock expansion; repairs to capsfor Tailings Containment Areas and decommissioned Waste Dump, incinerationor stockpiling for off-site disposal of waste from Camp operations; closure ofRayrock vent raises and Sun Rose mine shaft; capping waste rock andexploration workings at Sun Rose site; backfilling of trenches and blasted areasat Horn Plateau – REX Showing site; capping exploration workings at HornPlateau – REX Showing site; burial or trucking out of soil with hazardouschemicals from exploration sites; removal of hazardous waste at barge landingand power line sites; removal of non-hazardous waste from exploration sites;storage and use of explosives; excavation and on-site disposal of spilled tailings;brush and vegetation clearing for access roads; access road development andmaintenance; camp establishment at Rayrock and Sun Rose sites; use andregrading of quarry areas; fuel storage for operations; use of light and heavyequipment on site; treatment and encapsulation of Mill Lake sediments;encapsulation of soil, tailings, and waste rock in Confined Disposal Facility;burial of radiological-impacted debris in Confined Disposal Facility; off-sitedisposal of debris and materials within safe shipping limits for Uranium;removal and disposal of concrete foundations; sewage disposal; andremediation activities as approved in the Remedial Action Plan;b) Withdrawal of Water for use in camp operations, dust control, washing, winterroad construction, and remediation activities as approved in the RemedialAction Plan;c) Dewatering of Mill Lake to Waste Water Treatment Facility before deposit inSherman Lake,d) Depositing of Waste to Confined Disposal Facility and the Camp sump;e) Construction, operation, and maintenance of ice bridges to cross the EmileRiver or the Marian River;f) Construction, operation and maintenance of culverts to allow winter roadpassage;g) Construction, operation and maintenance of the Confined Disposal Facility andSun Main Waste Rock Cover; andh) Closure and Reclamation activities for the remediation and monitoring of theRayrock project sites.
Rayrock Mine Remedial Action Plan (Rayrock Remediation Project).
Documents
- AEMP - Annual Report (12)
- AEMP - Program (12)
- All Issuances (8)
- Annual Reports (3)
- Application and Related Docs (21)
- Assorted Management Plans (13)
- Consultations - Reviews - Work Plans (22)
- Designs and As-Builts (102)
- Engagement Plan (2)
- GIS Data (1)
- Inspection Reports (4)
- Interim Closure and Reclamation Plan (18)
- Operations and Notifications (20)
- Other (2)
- Preliminary Screening (5)
- Public Hearing (35)
- Sediment and Erosion Control (5)
- SNP Program (5)
- SNP Reports (25)
- Spill - Contingency - Emergency Response (8)
- Spill Reports (1)
- Technical Session (22)
- Waste Management Plan (13)
- Water Management (24)
Displaying 201 - 300 of 383
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Inspection Report - Aug 31_24.pdf (2.04 MB) | ||
Rayrock - Inspection Report Lab Results - Aug 31_24.pdf (480.5 KB) | ||
Rayrock - Inspection Report - Jul 30_24.pdf (1.3 MB) | ||
Rayrock - Inspection Report - May 30_24.pdf (5.22 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Confined Disposal Facility - Thermal Modelling - Jul 5_21.pdf (4.59 MB) | ||
Rayrock - Confined Disposal Facility - Hydrological Modelling - Sept 9_21.pdf (3.5 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - GT21-604 - Spill Follow up Report for NTNU 2023-500 - Dec 12_23.pdf (4.18 MB) |
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Engagement Plan - Version 4.0 - Decision Letter - Sept 29_22.pdf (187.92 KB) | ||
Rayrock - Engagement Plan - Version 4.0 - Sept 19_22.pdf (1.62 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Sediment and Erosion Control Plan - Version 2.1 - Reasons for Decision - Dec 14_23.pdf (322.24 KB) | ||
Rayrock - Sediment and Erosion Control Plan - Version 2.1 - Part 1 of 2 - Oct 18_23.pdf (18.29 MB) | ||
Rayrock - Sediment and Erosion Control Plan - Version 2.1 - Part 2 of 2 - Oct 18_23.pdf (5.66 MB) | ||
Rayrock - Sediment and Erosion Control Plan - Version 2.0 - Reasons for Decision - May 23_23.pdf (477.94 KB) | ||
Rayrock - Sediment and Erosion Control Plan - Version 2.0 - Mar 30_23.pdf (12.77 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Spill Contingency Plan - Version 4.2 - Part 1 - March 26_24.pdf (15.7 MB) | ||
Rayrock - Spill Contingency Plan - Version 4.2 – Conformity Confirmation – April 9_24.pdf (146.24 KB) | ||
Rayrock - Spill Contingency Plan - Version 4.2 - Part 2 - March 26_24.pdf (13.82 MB) | ||
Rayrock - Spill Contingency Plan - Version 4.1 - Decision Letter - Jul 6_23.pdf (210.31 KB) | ||
Rayrock - Spill Contingency Plan - Version 4.1 - Jun 7_23.pdf (21.4 MB) |