CIRNAC-CARD - W2020L8-0003
Status:
Issued
Authorization:
Licence
Activity:
Miscellaneous
Start:
November 18, 2021
Expiry:
November 17, 2031
Staff:
Anneli Jokela
This Licence entitles the Licensee to use Water and deposit Waste for remediation activities at the Rayrock Remediation Project in the area as described in the Type A Water Licence Application submitted September 21, 2020. The scope of this Licence includes the following:
a) Blasting, quarrying, and drilling activities for remediation activities; removal andshipping or burial of hazardous and non-hazardous waste in the ConfinedDisposal Facility; maintenance of Tailings Containment Areas andDecommissioned Waste Dump; Sherman Lake dock expansion; repairs to capsfor Tailings Containment Areas and decommissioned Waste Dump, incinerationor stockpiling for off-site disposal of waste from Camp operations; closure ofRayrock vent raises and Sun Rose mine shaft; capping waste rock andexploration workings at Sun Rose site; backfilling of trenches and blasted areasat Horn Plateau – REX Showing site; capping exploration workings at HornPlateau – REX Showing site; burial or trucking out of soil with hazardouschemicals from exploration sites; removal of hazardous waste at barge landingand power line sites; removal of non-hazardous waste from exploration sites;storage and use of explosives; excavation and on-site disposal of spilled tailings;brush and vegetation clearing for access roads; access road development andmaintenance; camp establishment at Rayrock and Sun Rose sites; use andregrading of quarry areas; fuel storage for operations; use of light and heavyequipment on site; treatment and encapsulation of Mill Lake sediments;encapsulation of soil, tailings, and waste rock in Confined Disposal Facility;burial of radiological-impacted debris in Confined Disposal Facility; off-sitedisposal of debris and materials within safe shipping limits for Uranium;removal and disposal of concrete foundations; sewage disposal; andremediation activities as approved in the Remedial Action Plan;b) Withdrawal of Water for use in camp operations, dust control, washing, winterroad construction, and remediation activities as approved in the RemedialAction Plan;c) Dewatering of Mill Lake to Waste Water Treatment Facility before deposit inSherman Lake,d) Depositing of Waste to Confined Disposal Facility and the Camp sump;e) Construction, operation, and maintenance of ice bridges to cross the EmileRiver or the Marian River;f) Construction, operation and maintenance of culverts to allow winter roadpassage;g) Construction, operation and maintenance of the Confined Disposal Facility andSun Main Waste Rock Cover; andh) Closure and Reclamation activities for the remediation and monitoring of theRayrock project sites.
Rayrock Mine Remedial Action Plan (Rayrock Remediation Project).
Documents
- AEMP - Annual Report (12)
- AEMP - Program (15)
- All Issuances (12)
- Annual Reports (9)
- Application and Related Docs (21)
- Assorted Management Plans (13)
- Consultations - Reviews - Work Plans (23)
- Designs and As-Builts (104)
- Engagement Plan (2)
- GIS Data (1)
- Inspection Reports (6)
- Interim Closure and Reclamation Plan (31)
- Operations and Notifications (20)
- Other (2)
- Preliminary Screening (5)
- Public Hearing (38)
- Sediment and Erosion Control (5)
- SNP Program (4)
- SNP Reports (26)
- Spill - Contingency - Emergency Response (8)
- Spill Reports (1)
- Technical Session (22)
- Waste Management Plan (17)
- Water Management (26)
Displaying 101 - 200 of 423
3. Amendment Application
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Water Licence Amendment Application - Work Plan Version 2.0 - Dec 9_24.pdf (305.77 KB) | ||
Rayrock - Water Licence Amendment Application - Work Plan Version 1.0 - Sep 20_24.pdf (307.5 KB) | ||
Rayrock - WL Amendment Application - Work Plan Comments - Sep 19_24.pdf (479.17 KB) | ||
Rayrock - Water Licence Amendment - Draft Work Plan - Sep 12_24.pdf (332.56 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - WL Amendment Application - Preliminary Screening Determination and RfD - Nov 29_24.pdf (426.63 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - 2024 Annual Water Licence Report - Part 2 - May 22_25.pdf (2.08 MB) | ||
Rayrock - 2024 Annual Water Licence Report - Part 4 - May 22_25.pdf (9.23 MB) | ||
Rayrock - 2024 Annual Water Licence Report - Part 5 - May 22_25.pdf (9.95 MB) | ||
Rayrock - 2024 Annual Water Licence Report - Part 6 - May 22_25.pdf (11.6 MB) | ||
Rayrock - 2024 Annual Water Licence Report - Part 1 - May 22_25.pdf (1.37 MB) | ||
Rayrock - 2024 Annual Water Licence Report - Part 3 - May 22_25.pdf (19.27 MB) | ||
Rayrock - 2023 Annual Report - May 31_24.pdf (14.19 MB) | ||
Rayrock - 2022 Annual Report - May 31_23.pdf (972.62 KB) | ||
Rayrock - 2021 Annual Report - May 31_22.pdf (464.84 KB) |