Skip to main content

Imperial Oil Resources N.W.T. Limited - S24S-003

​Imperial Oil Resources N.W.T Limited (Imperial) plans to undertake a geotechnical investigation to support the replacement of the flowlines within the Line 490 corridor beneath the Mackenzie River, in Norman Wells, NT. The flowlines are planned to be replaced using horizontal directional drilling (HDD). A geotechnical investigation is required to determine the subsurface conditions and provide additional information for the design of the HDD (the "Replacement Activities").

The proposed activities covered within this application consist of two vertical boreholes, one near the HDD entry point (Bear Island) and one near the exit point (Goose Island) on land  within Imperial's existing land titles. The investigation is anticipated to occur between June 1 and August 31, 2024. The investigation will take approximately three to five days, and will consist of the following: 

1) Drilling of 2 boreholes (6" diameter) to approximately 40m depth.

2) Collection of soil samples for laboratory analysis. 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
8. Closure and Reclamation
Final Closure and Reclamation Plan
Document Received/Sent Uploaded
S24S-003 - Final Plan - Map (1-50,000) Appendix A - Jan20_25.pdf (26.13 MB)
S24S-003 - Imperial to SLWB - Land Use Permit - Final Plan Submission and Discontinuance Request - Jan21 _25.pdf (198.46 KB)