Skip to main content

GNWT-INF (Sahtu) - S24L8-003


The Project includes the relocation of the Oscar Creek Bridge located at KM1054.4 of the Mackenzie Valley Winter Road (MVWR) to a location 2.9 kilometres (km) to the east (upstream), and the re-alignment of the MVWR from approximately KM1051 to KM1056 to connect with the new bridge location.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
S24L8-003 - Quarry Development Plan v.1.1 - Plan v.1.1 - Dec 9_25.pdf.pdf (9.75 MB)
S24L8-003 - Wildlife Management and Monitoring Plan v.1.1 - Plan v.1.1 - Dec 9_25.pdf (3.46 MB)
Sediment and Erosion Control
Document Received/Sent Uploaded
S24L8-003 - Erosion and Sedimentation Control Plan v.1.1 - Dec 9_25.pdf (2.39 MB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
S24L8-003 - Spill Contingency Plan v.1.1 - Dec 9_25.pdf (2.53 MB)
Water Management
Document Received/Sent Uploaded
S24L8-003 - Waste Management Plan v.1.1 - Dec 9_25.pdf (2.97 MB)