Skip to main content

GNWT-INF (Sahtu) - S24L8-003


The Project includes the relocation of the Oscar Creek Bridge located at KM1054.4 of the Mackenzie Valley Winter Road (MVWR) to a location 2.9 kilometres (km) to the east (upstream), and the re-alignment of the MVWR from approximately KM1051 to KM1056 to connect with the new bridge location.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 25 of 25
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
S24L8-003 - New Water Licence Application - Decision Letter - Aug23_24.pdf (291.21 KB)
S24L8-003 - Licence - Cover Page - Aug23_24.pdf (524.42 KB)
S24L8-003 - GNWT INF - Water Licence Conditions - Aug23_24.pdf (430.31 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
S24L8-003 - Appendix B - Erosion and Sedimentation Control Plan - May 14_24.pdf (1.31 MB)
S24L8-003 - Appendix B - Quarry Development Plan - Appendix A - Geotechnical Report - May 14_24.pdf (8.26 MB)
S24L8-003 - Appendix B - Quarry Development Plan - May 14_24.pdf (1.62 MB)
S24L8-003 - Appendix B - Waste Management Plan - May 14_24.pdf (2.34 MB)
S24L8-003 - Appendix B - Spill Contingency Plan - May 14_24.pdf (1.5 MB)
S24L8-003 - Appendix B - Wildlife Management and Monitoring Plan - May 14_24.pdf (2.01 MB)
S24L8-003 - GNWT INF - Draft Water Licence Conditions.pdf (373.27 KB)
S24L8-003 - Application Cover Letter - May 14_24.pdf (340.44 KB)
S24L8-003 - GNWT INF - Water Licence Application - May 14_24.pdf (629 KB)
S24L8-003 - Appendix D - Engagement Plan and Report - May 14_24.pdf (6.48 MB)
S24L8-003 - Appendix A - Oscar Creek Design Drawings - May 14_24.pdf (18.25 MB)
S24L8-003 - Appendix B - Management Plans (All Combined) - May 14_24.pdf (12.93 MB)
S24L8-003 - Appendix C - Oscar Creek Reports and Studies - file 1of3 - May 14_24.pdf (18.36 MB)
S24L8-003 - Appendix C - Oscar Creek Reports and Studies - file 2of3 - May 14_24.pdf (18.84 MB)
S24L8-003 - Appendix C - Oscar Creek Reports and Studies - file 3of3 - May 14_24.pdf (13.78 MB)
S24L8-003 - Attachment A - Project Descripion Report - May 14_24.pdf (6.45 MB)
S24L8-003 - Attachment B - Tulita District Land Corporation Letter of Support - Aug 03_23.pdf (446.4 KB)
S24L8-003 - Attachment C - Fisheries and Oceans Canada Letter of Advice - Oct 16_23.pdf (235.72 KB)
S24L8-003 - Attachment D - Construction Specifications - May 14_24.pdf (3.37 MB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S24E-006 - S24L8-003 - Staff Report - Aug23_24.pdf (531.32 KB)
S24E-006 - S24L8-003 - Reviewer Comments and Proponent Responses_Jun25_24.pdf (379.2 KB)
Preliminary Screening
Document Received/Sent Uploaded
S24E-006 - S24L8-003 - Preliminary Screening Determination and Notification - Aug23_24.pdf (1.05 MB)