Skip to main content

MGM Energy - S03L1-015

Associated Land Use Permit is S03A-007​.  Exploratory oil and gas drilling of two wells in the Lac Maunoir area located approximately 35km north east of Colville Lake.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 39 of 39
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
S03A-007 - S03L1-015 - Maunoir C-34 - Wellsite - 2019 Environmental Site Monitoring Report - Apr 1 _20.pdf (9.97 MB)
S03A-007 - S03L1-015 - Maunoir L-80 Wellsite Sump - 2019 Environmental Site Monitoring Report - Apr 1 _20.pdf (13.19 MB)
S03L1-015 - 2018 Environmental Site Monitoring Report- Maunoir C-34 Wellsite - Dec 17_18.pdf (5.89 MB)
S03L1-015 - ReviewCommentTable 2017 Annual Report - Apr 6_18.pdf (422.28 KB)
S03L1-015 S03A-007 - 2017 Annual Report - Maunoir C-34 Wellsite - Dec 22_17.pdf (5.43 MB)
S03L1-015 S03A-007 - 2017 Annual Report - Maunoir L-80 Wellsite, Drilling and camp sumps- Dec 22_18.pdf (3.72 MB)
S03L1-015 - 2015 Annual Report - Review Comment Table - Mar 10_16.pdf (280.46 KB)
S03L1-015 - 2015 Summer Site Inspection Report - Maunoir C-34 Wellsite - Dec 11_15.pdf (11.26 MB)
S03L1-015 - 2015 Summer Site Inspection Report - Maunoir L-80 Wellsite, drilling and camp sumps - Dec 7_15.pdf (17.81 MB)
S03L1-015 - 2014 Maunoir L-80 Report - Oct 23_15.pdf (7.03 MB)
S03L1-015 - 2014 Summer Site Inspection Report - Maunoir C-34 - Feb 18_15.pdf (3.54 MB)
S03L1-015 - 2014 Summer Site Inspection Report - Maunoir L-80 Wellsite, remote and camp sumps - Feb 18_15.pdf (4.22 MB)
S03L1-015 - 2013 Summer Site Inspection Maunoir C-34 - Nov 04_13.pdf (7.18 MB)
S03L1-015 - 2013 Summer Site Inspection Maunoir L-80 - Nov 4_13.pdf (10.03 MB)
S03L1-015 - 2012 Summer Site Inspection Report - Maunoir C-34 Lease, Remote Sump - Oct 12_12.pdf (2.39 MB)
S03L1-015 - 2012 Summer Site Inspection Report - Maunoir L-80 Lease, Drilling Sump, Campsite - Oct 12_12.pdf (2.26 MB)
S03L1-015 - 2011 Summer Site Inspection Report - Maunoir C-34 Lease Remote Sump - Nov 11_11.pdf (5.05 MB)
S03L1-015 - 2011 Summer Site Inspection Report - Maunoir L-80 Lease Drilling Sump Campsite - Nov 11_11.pdf (2.98 MB)
S03L1-015 - 2010 Summer Inspection - Abandonment and Restoration Report (C-34 and L-80 Wellsites) - Nov 22_10.pdf (3.48 MB)
S03L1-015 - 2009 Annual Report - Aug 25_09.pdf (118.57 KB)
S03L1-015 - 2008 Annual Report - Aug 29_08.pdf (62.88 KB)
S03L1-015 - 2007 Annual Report - Aug 31_07.pdf (86.88 KB)
S03L1-015 - 2006 Annual Report - Sept 1_06.pdf (117.01 KB)
S03L1-015 - Additional Information for 2005 Annual Reporting - Sept 8_05.pdf (818.64 KB)
S03L1-015 - 2003-2004 Annual Report - Jan 28_05.pdf (1.18 MB)
Assignments
Document Received/Sent Uploaded
S03L1-015- 2018 Environmental Site Monitoring Report - Maunoir L-80 Wellsite Drilling Sump and Camp Sump - Dec 17_18.pdf (7.5 MB)
Designs and As-Builts
Document Received/Sent Uploaded
S03L1-015 - As-Built Drawings (L-80) - May 16_06.pdf (127.62 KB)
Inspection Reports
Document Received/Sent Uploaded
S03L1-015 - Environmental Inspection Report -Sept 25_13.pdf (877.57 KB)
S03L1-015 - Aboriginal Affairs and Northern Development Canada Response to 2011 Summer Site Inspection Reports - May 30_12.pdf (74.43 KB)
S03L1-015 - Extension Request for Summer Site Inspection Reports - Oct 13_10.pdf (68.29 KB)
S03L1-015 - 2009 Summer Inspection - Abondonment and Restoration Reports - Oct 23_09.pdf (2.25 MB)
S03L1-015 - 2008 Summer Inspection Report - Sept 30_08.pdf (2.12 MB)
S03L1-015 - 2007 Summer Site Inspection Report - Aug 28_07.pdf (1.2 MB)
S03L1-015 - 2006 Summer Site Inspection Report - Sept 21_06.pdf (807.92 KB)
S03L1-015 - 2005 Summer Site Inspection Report - Sept 27_05.pdf (770.32 KB)
S03L1-015 - Apache Response to SLWB Regarding Violation of Terms and Conditions - 2003-2004 Drilling Program - Aug 17_05.pdf (102.15 KB)
S03L1-015 - Inspection Report - Jan 21_05.pdf (144.92 KB)
S03L1-015 - Inspection Report - Mar 16_04.pdf (92.46 KB)
S03L1-015 - Inspection Report - Jan 29_04.pdf (75 KB)