Skip to main content

MGM Energy - S03L1-015

Associated Land Use Permit is S03A-007​.  Exploratory oil and gas drilling of two wells in the Lac Maunoir area located approximately 35km north east of Colville Lake.
Uploaded On or After
Uploaded On or Before
Displaying 1 - 83 of 83
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
S03L1-015 - Water Licence Renewal - Apr 1_09.pdf (127.9 KB)
S03L1-015 - Water Licence - Dec 13_03.pdf (908.25 KB)
Assignments
Document Received/Sent Uploaded
S03L1-015 - MGM Energy Assignments ReviewCommentTable - Aug 30_18.pdf (223.38 KB)
S03L1-015 - MGM Energy - Water Licence Assignment - Sept 26_18.pdf (371.44 KB)
S03L1-015 - Application to Assign - July 6_18.PDF (65.63 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
S03L1-015 - Request for Renewal - Application - Nov 18_08.pdf (202.89 KB)
S03L1-015 - Staff Report 2 - Dec 8_03.pdf (1016.82 KB)
S03L1-015 - Staff Report 1 - Nov 26_03.pdf (1.21 MB)
S03L1-015 - Water Licence Application - Appendix 1 - Environmental Protection Plan - Oct 20_03.pdf (691.69 KB)
S03L1-015 - Water Licence Application - Appendix 1A - Photographs - Oct 20_03.pdf (482.71 KB)
S03L1-015 - Water Licence Application - Appendix 1B - Maps - Oct 20_03.pdf (3.17 MB)
S03L1-015 - Water Licence Application - Appendix 1C - Water Source Info - Oct 20_03.pdf (1.71 MB)
S03L1-015 - Water Licence Application - Appendix 5 - Emergency Response and Spill Contingency Plans - Oct 20_03.pdf (2.3 MB)
S03L1-015 - Water Licence Application - Appendix 6 - Equipment Lists - Oct 20_03.pdf (127.37 KB)
S03L1-015 - Water Licence Application - Appendix 1D - Pre-Disturbance Assessments - Oct 20_03.pdf (533.85 KB)
S03L1-015 - Water Licence Application - Appendix 1E - Mineral Oil-Based Drilling Fluid Info - Oct 20_03.pdf (858.26 KB)
S03L1-015 - Water Licence Application - Appendix 1F - Consultation Notices and Attendee Lists - Oct 20_03.pdf (561.12 KB)
S03L1-015 - Water Licence Application - Appendix 3 - Operating and Exploration Licences - Oct 20_03.pdf (381.58 KB)
S03L1-015 - Water Licence Application - Appendix 5 - Part 2 - Oct 20_03.pdf (2.33 MB)
S03L1-015 - Water Licence Application - Oct 20_03.pdf (636.72 KB)
Assignments
Document Received/Sent Uploaded
S03L1-015 - MGM Energy - Issuance Letter - Sept 26_18.pdf (45.27 KB)
S03L1-015 - MGM Energy - Assignment - Staff Report - Sep 26_18.pdf (265.99 KB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S03L1-015 - Review Comments from Referral Organizations - Request for Renewal - Jan 9_09.pdf (935.65 KB)
S03L1-015 - Review Comments from DFO - Dec 4_03.pdf (317.03 KB)
S03L1-015 - Review Comments from Behdzi Ahda First Nation - Nov 27_03.pdf (64.53 KB)
S03L1-015 - Review Comments from NEB - Nov 27_03.pdf (804.74 KB)
S03L1-015 - Review Comments from Resources Wildlife and Economic Development (GNWT) - Nov 26_03.pdf (123.84 KB)
S03L1-015 - Review Comments from Town of Norman Wells - Nov 24_03.pdf (107.93 KB)
S03L1-015 - Review Comments from SLUPB - Nov 24_03.pdf (103.97 KB)
S03L1-015 - Review Comments from Department of Transportation (GNWT) - Nov 21_03.pdf (19.1 KB)
S03L1-015 - Review Comments from DFO - Nov 21_03.pdf (134.11 KB)
S03L1-015 - Review Comments from NEB - Nov 21_03.pdf (259.97 KB)
S03L1-015 - Review Comments from Environment Canada - Nov 20_03.pdf (146.78 KB)
S03L1-015 - Review Comments from INAC (Water Resources Dept.) - Nov 20_03.pdf (282.26 KB)
S03L1-015 - Review Comments from Dept. of Health and Social Services - Nov 18_03.pdf (120.53 KB)
S03L1-015 - Review Comments from INAC (North Mackenzie Dist.) - Nov 18_03.pdf (654.1 KB)
S03L1-015 - Review Comments from SRRB - Nov 18_03.pdf (60.1 KB)
S03L1-015 - Review Comments from MVLWB - Nov 17_03.pdf (51.46 KB)
S03L1-015 - Review Comments from Fire Marshal - Nov 15_03.pdf (97.99 KB)
S03L1-015 - Request for Comments - Nov 3_03.pdf (73.25 KB)
S03L1-015 - Review Comments from Prince of Wales Northern Heritage Center - Oct 20_03.pdf (33.49 KB)
Preliminary Screening
Document Received/Sent Uploaded
S03L1-015 - Preliminary Screening - Dec 13_03.pdf (600.78 KB)
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
S03A-007 - S03L1-015 - Maunoir C-34 - Wellsite - 2019 Environmental Site Monitoring Report - Apr 1 _20.pdf (9.97 MB)
S03A-007 - S03L1-015 - Maunoir L-80 Wellsite Sump - 2019 Environmental Site Monitoring Report - Apr 1 _20.pdf (13.19 MB)
S03L1-015 - 2018 Environmental Site Monitoring Report- Maunoir C-34 Wellsite - Dec 17_18.pdf (5.89 MB)
S03L1-015 - ReviewCommentTable 2017 Annual Report - Apr 6_18.pdf (422.28 KB)
S03L1-015 S03A-007 - 2017 Annual Report - Maunoir C-34 Wellsite - Dec 22_17.pdf (5.43 MB)
S03L1-015 S03A-007 - 2017 Annual Report - Maunoir L-80 Wellsite, Drilling and camp sumps- Dec 22_18.pdf (3.72 MB)
S03L1-015 - 2015 Annual Report - Review Comment Table - Mar 10_16.pdf (280.46 KB)
S03L1-015 - 2015 Summer Site Inspection Report - Maunoir C-34 Wellsite - Dec 11_15.pdf (11.26 MB)
S03L1-015 - 2015 Summer Site Inspection Report - Maunoir L-80 Wellsite, drilling and camp sumps - Dec 7_15.pdf (17.81 MB)
S03L1-015 - 2014 Maunoir L-80 Report - Oct 23_15.pdf (7.03 MB)
S03L1-015 - 2014 Summer Site Inspection Report - Maunoir C-34 - Feb 18_15.pdf (3.54 MB)
S03L1-015 - 2014 Summer Site Inspection Report - Maunoir L-80 Wellsite, remote and camp sumps - Feb 18_15.pdf (4.22 MB)
S03L1-015 - 2013 Summer Site Inspection Maunoir C-34 - Nov 04_13.pdf (7.18 MB)
S03L1-015 - 2013 Summer Site Inspection Maunoir L-80 - Nov 4_13.pdf (10.03 MB)
S03L1-015 - 2012 Summer Site Inspection Report - Maunoir L-80 Lease, Drilling Sump, Campsite - Oct 12_12.pdf (2.26 MB)
S03L1-015 - 2012 Summer Site Inspection Report - Maunoir C-34 Lease, Remote Sump - Oct 12_12.pdf (2.39 MB)
S03L1-015 - 2011 Summer Site Inspection Report - Maunoir L-80 Lease Drilling Sump Campsite - Nov 11_11.pdf (2.98 MB)
S03L1-015 - 2011 Summer Site Inspection Report - Maunoir C-34 Lease Remote Sump - Nov 11_11.pdf (5.05 MB)
S03L1-015 - 2010 Summer Inspection - Abandonment and Restoration Report (C-34 and L-80 Wellsites) - Nov 22_10.pdf (3.48 MB)
S03L1-015 - 2009 Annual Report - Aug 25_09.pdf (118.57 KB)
S03L1-015 - 2008 Annual Report - Aug 29_08.pdf (62.88 KB)
S03L1-015 - 2007 Annual Report - Aug 31_07.pdf (86.88 KB)
S03L1-015 - 2006 Annual Report - Sept 1_06.pdf (117.01 KB)
S03L1-015 - Additional Information for 2005 Annual Reporting - Sept 8_05.pdf (818.64 KB)
S03L1-015 - 2003-2004 Annual Report - Jan 28_05.pdf (1.18 MB)
Assignments
Document Received/Sent Uploaded
S03L1-015- 2018 Environmental Site Monitoring Report - Maunoir L-80 Wellsite Drilling Sump and Camp Sump - Dec 17_18.pdf (7.5 MB)
Designs and As-Builts
Document Received/Sent Uploaded
S03L1-015 - As-Built Drawings (L-80) - May 16_06.pdf (127.62 KB)
Inspection Reports
Document Received/Sent Uploaded
S03L1-015 - Environmental Inspection Report -Sept 25_13.pdf (877.57 KB)
S03L1-015 - Aboriginal Affairs and Northern Development Canada Response to 2011 Summer Site Inspection Reports - May 30_12.pdf (74.43 KB)
S03L1-015 - Extension Request for Summer Site Inspection Reports - Oct 13_10.pdf (68.29 KB)
S03L1-015 - 2009 Summer Inspection - Abondonment and Restoration Reports - Oct 23_09.pdf (2.25 MB)
S03L1-015 - 2008 Summer Inspection Report - Sept 30_08.pdf (2.12 MB)
S03L1-015 - 2007 Summer Site Inspection Report - Aug 28_07.pdf (1.2 MB)
S03L1-015 - 2006 Summer Site Inspection Report - Sept 21_06.pdf (807.92 KB)
S03L1-015 - 2005 Summer Site Inspection Report - Sept 27_05.pdf (770.32 KB)
S03L1-015 - Apache Response to SLWB Regarding Violation of Terms and Conditions - 2003-2004 Drilling Program - Aug 17_05.pdf (102.15 KB)
S03L1-015 - Inspection Report - Jan 21_05.pdf (144.92 KB)
S03L1-015 - Inspection Report - Mar 16_04.pdf (92.46 KB)
S03L1-015 - Inspection Report - Jan 29_04.pdf (75 KB)
6. Management Plans
Waste Management Plan
Document Received/Sent Uploaded
S03L1-015 - Revised Waste Management Plans - Mar 21_05.pdf (220.15 KB)
8. Closure and Reclamation
Progressive Reclamation
Document Received/Sent Uploaded
S03L1-015 - MGM-Apache 2012 Sahtu Reclamation Plan - June 28_12.pdf (4.56 MB)