Canadian Zinc Corporation - MV2021L2-0004
Allied Permit: MV2021D0005
To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.
Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Prairie Creek Mine - Annual Review Notice - Mar20_25.pdf (144.65 KB) | ||
CZN - Annual Management Plan Review - 2024 - Mar12_24.pdf (155.96 KB) | ||
CZN - Type A Licence and Permit - Submission Requirements - Oct17_22.pdf (143.68 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN – Approved - Engagement Plan V2 - Apr26_23.pdf (183.24 KB) | ||
CZN - Engagement Plan - Version 2 - Mar2_23.pdf (1.16 MB) | ||
CZN - Engagement Plan V2 - Incomplete - Jan10_23.pdf (177.52 KB) | ||
CZN - Engagement Plan V2 - Incomplete Conformity Review - Jan10_23.pdf (84.21 KB) | ||
CZN - Mineral Exploration - EP V1 - Jul21-20.pdf (1.63 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Mineral Exploration - SCP V2 - Sep23-20.pdf (9.25 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Mineral Exploration - WMP V2 - Aug18-20.pdf (859.27 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Mineral Exploration - GVP V2.2.pdf (1020.79 KB) |