Canadian Zinc Corporation - MV2021L2-0004
Allied Permit: MV2021D0005
To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.
Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Prairie Creek Mine - Amendment - Work Plan V1 - Mar25_25.pdf (225.47 KB) | ||
MV2021L4-0004 - CZN - Amendment - Water Use Receipt - Feb17_25.pdf (58.71 KB) | ||
CZN - Prairie Creek Mine - Amendment - Work Plan - CZN Comments - Mar7_25.pdf (91.59 KB) | ||
CZN - Receipt - Amendment Fee - Feb17_25.pdf (39.56 KB) | ||
CZN - Prairie Creek Mine - Amendment - Work Plan - Draft.pdf (225.71 KB) | ||
CZN - Prairie Creek Mine - Amendment Application - Feb11_25.pdf (730.64 KB) | ||
CZN – Approval - Schedule 6 Change - Dec21_23.pdf (1.27 MB) | ||
CZN - Type A Mining and Milling - Licence - Updated Schedule 6 - draft.docx (537.63 KB) | ||
CZN - Request to Change Schedule 6 - Oct20_23.pdf (691.94 KB) |