Canadian Zinc Corporation - MV2021L2-0004
Allied Permit: MV2021D0005
To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.
Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Annual Geotechnical Inspection Report - Part 1 of 2 - Nov19_24.pdf (15.63 MB) | ||
CZN - Geotechnical Inspection Report - Part 2 of 2 - Nov19_24.pdf (24.95 MB) | ||
CZN - Notice of Annual Geotech Inspection - Aug2_24.pdf (138.51 KB) | ||
CZN - Mine Site - Inspection Report - Apr30_24.pdf (2.6 MB) | ||
CZN - Geotechnical Inspection Requirements - Correspondence - Dec5_23.pdf (234.13 KB) | ||
CZN - Flood Protection Berm and Water Storage Pond - 2023 Annual Geotechnical Inspection - Nov22_23.pdf (56.56 MB) | ||
CZN - Inspection Report - Apr28_23.pdf (2.71 MB) | ||
CZN - Flood Protection Berm and Water Storage Pond - 2022 Annual Geotechnical Inspection - Mar29_23.pdf (32.8 MB) |