Canadian Zinc Corporation - MV2021L2-0004
Allied Permit: MV2021D0005
To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.
Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.
Document | Received/Sent | Uploaded |
---|---|---|
CZN – Schedule 6 Change - Dec21_23.pdf (1.27 MB) | ||
CZN – Workplan Extension Request and Administrative Updates - Oct5_23.pdf (1.25 MB) | ||
CZN - Issuance - Type A Water Licence - Sep23_22.pdf (3.22 MB) | ||
CZN - ANNEX A - Ministerial Approval Letter - Sep23_22.pdf (762.63 KB) | ||
CZN - Board Recommendation - Type A Water Licence - Aug10_22.pdf (3.08 MB) |