Skip to main content

Pine Point Mining Limited - MV2020L8-0012

Pine Point Confirmation and Exploration Program: 
exploration by drilling/pitting to find additional mineral deposits; definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; andfuel storage.

Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board

Uploaded On or After
Uploaded On or Before
Displaying 201 - 231 of 231
6. Management Plans
Water Management
Document Received/Sent Uploaded
PPML - Water Withdrawal Plan V2.3 - Sept 12_24.pdf (27.19 MB)
PPML - Water Management Plan V1.4 - Sep10_24.pdf (11.26 MB)
PPML - Water Management Plan V1.2 - Comformity Confirmation - Aug31_22.pdf (2.99 MB)
PPML - Water Management Plan V1.2 - Aug30_22.pdf (2.9 MB)
PPML - Water Withdrawal Plan V2.1 - Aug31_22.pdf (47.92 MB)
PPML - Revisions Required - Water Management Plan v1.1 - Aug8_22.pdf (216.74 KB)
PPML - Water Management Plan v1.1 - Staff Report and Comments - Aug8_22.pdf (550.31 KB)
PPML – Water Withdrawal Plan v2 - Staff Report and Comments - Jul29_22.pdf (627.58 KB)
PPML – Approved - Water Withdrawal Plan V2 - Jul25_22.pdf (208.45 KB)
PPML - Water Management Plan V1.1 - Jul4_22.pdf (1003.07 KB)
PPML - Revisions Required - Water Management Plan Version 1 - Jun2_22.pdf (239.97 KB)
PPML - Water Withdrawal Plan - V2.0 - May16_22.pdf (54.61 MB)
PPML - Water Management Plan V1 - Mar16_22.pdf (892.99 KB)
7. Monitoring Programs
WEMP - Wildlife Effects Monitoring Program
Document Received/Sent Uploaded
PPML - Wildlife Management and Monitoring Plan - Version 2.2 - May 31_22.pdf (7.68 MB)
PPML - 2022 Annual Wildlife Management and Monitoring Plan Report - Aug 31_23.pdf (12.34 MB)
PPML - Noncompliance with reporting requirements of the approved WMMP - Aug4_23.pdf (270.59 KB)
PPML - Approved - Wildlife Monitoring and Management Plan - Mar21_22.pdf (425.02 KB)
PPML - Wildlife Monitoring and Management Plan - Vesion 2.1 - Dec23_21.pdf (5.34 MB)
PPML - Wildlife Management and Monitoring Plan - Version 1.1 - Aug18_21.pdf (6.27 MB)
PPML - Wildlife Management and Monitoring Plan - Version 1.1 - Cover Letter - Aug18_21.pdf (159.89 KB)
PPML - Wildlife Management and Monitoring Plan Determination - Apr30_21.pdf (2.44 MB)
8. Closure and Reclamation
9. GIS Data
GIS Data
Document Received/Sent Uploaded
PPML - GIS Data - Roads and Camp - Nov27_20.zip (79.11 KB)
Shapefiles
Document Received/Sent Uploaded
PPML - GIS Data - Drilling Areas - Feb26_21.zip (5.24 KB)