Pine Point Mining Limited - MV2020L8-0012
Status:
Issued
Authorization:
Licence
Activity:
Miscellaneous
Start:
December 8, 2021
Expiry:
December 7, 2028
Staff:
Kim Murray
Pine Point Confirmation and Exploration Program:
exploration by drilling/pitting to find additional mineral deposits; definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; andfuel storage.
exploration by drilling/pitting to find additional mineral deposits; definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; andfuel storage.
Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board
Documents
- All Issuances (6)
- Annual Reports (10)
- Application and Related Docs (39)
- Conceptual Closure and Reclamation Plan (8)
- Consultations - Reviews - Work Plans (18)
- Engagement Plan (2)
- GIS Data (1)
- Inspection Reports (1)
- Operations and Notifications (5)
- Preliminary Screening (5)
- Public Hearing (51)
- Security and Water Use Fees (4)
- Sediment and Erosion Control (5)
- Shapefiles (1)
- SNP Reports (15)
- Spill - Contingency - Emergency Response (7)
- Technical Session (20)
- Waste Management Plan (3)
- Water Management (22)
- WEMP - Wildlife Effects Monitoring Program (8)
Displaying 101 - 200 of 231
3. Amendment Application
Document | Received/Sent | Uploaded |
---|---|---|
PPML - Amendment - Draft Licence Conditions - Feb 5_24.pdf (740.68 KB) | ||
PPML - Amendment - Work Plan - Version 1.5 - External - Feb 5_24.pdf (310.11 KB) | ||
PPML - 2023 Amendment - Work Plan - Version 1.4 - External - Dec18_23.pdf (286.3 KB) | ||
PPML - 2023 Amendment - Work Plan - Version 1.3 - External - Sept26_23.pdf (311.78 KB) | ||
PPML - Amendment - Work Plan - Version 1.2 - Jul27_23.pdf (261.07 KB) | ||
PPML - Amendment - Work Plan - Version 1.1 - Jun9_23.pdf (260.29 KB) | ||
PPML - Amendment - Work Plan Comments - GNWT-ECC - Jun7_23.pdf (148.76 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML – Amendment – Review Summery Table - Preliminary Screening - Jul28_23.pdf (911.64 KB) | ||
PPML – Amendment - Notification - Preliminary Screening Determination - Jul28_23.pdf (515.08 KB) | ||
PPML - Notification - Preliminary Screening Determination - Sep1_22.pdf (398 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - Amendment - Closing Arguments From PPML - Mar12_24.pdf (614.43 KB) | ||
PPML - Amendment - Closing Argument - FRMG - Mar 5_24.pdf (87.45 KB) | ||
PPML - Amendment - Closing Argument - GNWT-ECC - Mar 5_24.pdf (304.55 KB) | ||
PPML - Amendment - Closing Argument - DKFN - Mar 5_24.pdf (696.86 KB) | ||
PPML - Amendment - Public Hearing - Cancellation of Public Hearing - Feb 2_24.pdf (661.62 KB) | ||
PPML - Amendment - Public Hearing - Newspaper Ad - Jan 8_24.pdf (481.76 KB) | ||
PPML -Amendment - Response to Interventions - Dec15_23.pdf (305.06 KB) | ||
PPML - Amendment - Request to extend the Intervention Responses deadline.pdf (142.6 KB) | ||
PPML - Amendment - Intervention from GNWT - Dec7_23.pdf (346.89 KB) | ||
PPML- Amendment - Intervention from FRMG - Dec7_23.pdf (93.63 KB) | ||
PPML - Amendment - Invervention from DKFN - Dec7_23.pdf (265.45 KB) | ||
PPML - Amendment - Pre-hearing Conference Agenda - Nov21_23.pdf (225.15 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - Amendment - Technical Session - Transcript - Nov7_23.pdf (1.75 MB) | ||
PPML - Amemdent - Technical Session - Information Request Response - Nov23_23.pdf (357.61 KB) | ||
PPML - Amendment - Technical Session - Information Request - Nov9_23.pdf (192.39 KB) | ||
PPML - Technical Session - Project Presentation - Nov7_23.pdf (3 MB) | ||
PPML - Amendment - Technical Session Agenda - Oct31_23.pdf (252.46 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
PPML - 2024 Annual Water Licence Report - Mar 28_25.pdf (668.34 KB) | ||
PPML – 2023 Annual Report - Revisions Required - Mar24_25.pdf (221.77 KB) | ||
PPML – 2023 Annual Report - Review Comment Table - Mar24_25.pdf (379.54 KB) | ||
PPML - 2023 Annual Water Licence Report - Extension Request - Apr 22_24.pdf (509.54 KB) | ||
PPML - 2023 Annual Report - Jun7_24.pdf (13.51 MB) | ||
PPML – Acknowledgement - 2022 Annual Report V1.2- Oct16_23.pdf (162.59 KB) | ||
PPML – 2022 Annual Report - Review Summery Table - Oct16_23.pdf (402.59 KB) | ||
PPML - 2022 Annual Water Licence Report V 1.2 - Aug 21_23.pdf (18.56 MB) | ||
PPML - 2022 Annual Water Licence Report V 1 - Jul14_23.pdf (11.89 MB) | ||
PPML - 2022 Annual Report - Extension Request - Approved - Mar 28_23.pdf (173.35 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - Inspection Report - February 15, 2023 - Nov3_23.pdf (8.45 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - Pump Test Compatability Authorization - Email Chain - Nov29_23.pdf (1.03 MB) | ||
PPML - Pump Test Compatibility Authorization - Nov29_23.pdf (617.24 KB) | ||
PPML - Pump Test Compatability Request and Approval - Nov10_23.pdf (1.38 MB) | ||
PPML - Correspondence Re Water Consumption - Feb 1_23.pdf (491.2 KB) | ||
PPML - Water Compatibility Test Results - Oct7_22.pdf (6.67 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - SNP-1 Report - April 2023 - March 18_25.pdf (1.23 MB) | ||
PPML - SNP-1 Report - February 2023 - March 18_25.pdf (2.66 MB) | ||
PPML - SNP-1 Report - January 2023 - March 18_25.pdf (2.14 MB) | ||
PPML - SNP-1 Report - March 2023 - March 18_25.pdf (4.5 MB) | ||
PPML - SNP-1 Report - November 2023 - March 18_25.pdf (8.24 MB) | ||
PPML - SNP-1 Report - October 2023 - March 18_25.pdf (3.08 MB) | ||
PPML - SNP-1 Report - April 2024 - March 18_25.pdf (432.85 KB) | ||
PPML - SNP-1 Report - February 2024 - March 18_25.pdf (1.72 MB) | ||
PPML - SNP-1 Report - November 2024 - March 18_25.pdf (2.38 MB) | ||
PPML - SNP-1 Report - October 2024 - March 18_25.pdf (1.25 MB) | ||
PPML - SNP-1 Report - May 2023 - March 18_25.pdf (1.27 MB) | ||
PPML - SNP-1 Report - January 2024 - March 18_25.pdf (714.68 KB) | ||
PPML - SNP-1 Report - March 2024 - March 18_25.pdf (1.96 MB) | ||
PPML - Correspondence Re SNP Reports - Feb 11_25.pdf (443.87 KB) | ||
PPML – QAQC Plan and Approval Letter – Jun26_24.pdf (24.46 MB) |
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
PPML - Engagement Plan - V2.2 - Conformity Confirmation - Apr22_22.pdf (148.99 KB) | ||
PPML - Engagement Plan V2.2 - Apr6_22.pdf (337.41 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - ESMP V1.1 - Board staff Confirmation of Conformity.pdf (161.46 KB) | ||
PPML - Erosion and Sedimentation Management Plan - Version 1.1 - Jan 31_25.pdf (6.85 MB) | ||
PPML – Erosion and Sedimentation Management Plan – V1 - Review Comment Table - Oct25_24.pdf (373.03 KB) | ||
PPML – Erosion and Sedimentation Management Plan – V1 - Revisions Required - Oct28_24.pdf (210.4 KB) | ||
PPML - Erosion and Sediment Control Plan V1 - Sep8_24.pdf (17.57 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - SCP V1.3 - Board staff Confirmation of Conformity.pdf (165.86 KB) | ||
PPML - Spill Contingency Plan - Version 1.3 - Jan 31_25.pdf (9.33 MB) | ||
PPML – Spill Contingency Plan – V1.2 - Revisions Required - Oct28_24.pdf (215.57 KB) | ||
PPML – Spill Contingency Plan – V1.2 - Review Comment Table - Oct25_24.pdf (452.22 KB) | ||
PPML - Spill Contingency Plan V1.2 - Sept 12_24.pdf (8.42 MB) | ||
PPML - Spill Contingency Plan - V1.1 - Conformity Confirmation - Apr22_22.pdf (157.5 KB) | ||
PPML - Spill Contingency Plan V1.1 - Apr6_22.pdf (8.39 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - Waste Management Plan - V1.3 - Conformity Confirmation - Apr22_22.pdf (158.53 KB) | ||
PPML - Waste Management Plan V1.3 - Apr6_22.pdf (1.19 MB) | ||
PPML - Waste Management Plan V1.1 - Mar8_22.pdf (1.07 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML – Water Management Plan – Version 1.5 - Not Approved - Mar24_25.pdf (180.99 KB) | ||
PPML – Water Management Plan – Version 1.5 - Review Comment Table - Mar24_25.pdf (182 KB) | ||
PPML - Water Management Plan - Version 1.5 - Feb 5_25.pdf (10.8 MB) | ||
Pine Point - WWP V2.4 - Board staff Confirmation of Conformity.pdf (165.73 KB) | ||
PPML - Water Withdrawal Plan - Version 2.4 - Jan 31_25.pdf (30.08 MB) | ||
PPML – Water Management Plan – V1.4 - Review Comment Table - Oct25_24.pdf (399.74 KB) | ||
PPML – Water Management Plan – V1.4 - Revisions Required - Oct28_24.pdf (226.67 KB) | ||
PPML – Water Withdrawal Plan V2.3 - Review Comment Table – Oct25_24.pdf (469.13 KB) | ||
PPML – Water Withdrawal Plan V2.3 - Revisions Required – Oct28_24.pdf (209.93 KB) |