Enbridge Pipelines (NW) Inc. - MV2017L1-0002
Line 21 pipeline replacement (Norman Wells to Zama) near kilometre post (KP) 529 (the project). The project is located near the Mackenzie River, approximately 9 kilometres east of the village of Fort Simpson, in the Dehcho Region of the Northwest Territories.
Note that the pipeline crossing is a segment replacement project for an existing pipeline that is regulated by the National Energy Board (NEB). The replacement segment to be constructed will cross underneath the Mackenzie River at an anticipated depth of 90-110 metres below the river bed. The construction work sites on either side of the river crossing will be above the oridinary high water mark. An application for the project was filed with the NEB on March 10, 2017 and is accessible on the NEBs Public Registry at https://apps.neb-one.gc.ca/REGDOCS/Home/Index.
Associated Land Use Permit: MV2017P0013Documents
- All Issuances (2)
- Annual Reports (13)
- Application and Related Docs (23)
- Consultations - Reviews - Work Plans (37)
- Engagement Plan (3)
- Further Study Requested Sec. 22.2.b (1)
- GIS Data (1)
- Inspection Reports (1)
- Interim Closure and Reclamation Plan (4)
- Operations and Notifications (1)
- Preliminary Screening (5)
- Progress Reports (1)
- Public Hearing (76)
- Security and Water Use Fees (4)
- Sediment and Erosion Control (4)
- Shapefiles (1)
- SNP Program (1)
- Spill - Contingency - Emergency Response (4)
- Technical Session (1)
- Waste Management Plan (6)
- Water Management (7)
Document | Received/Sent | Uploaded |
---|---|---|
MV2017L1-0002 - Enbridge Pipelines - Minister Approval and WL Issuance Letter - Mar12-18.pdf (256.97 KB) | ||
MV2017L1-0002 - Enbridge Pipelines NW - Issuance Letter with Licence-Conditions and RFD - Mar9-18.pdf (1.48 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc. Line 21 Replacement - Work Plan updated - Dec12-17.pdf (57.5 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
Enbridge Pipelines - GNWT-ECC Return of Security - Feb 23_24.pdf (435.65 KB) | ||
MV2017L1-0002 - Enbridge Pipelines - Receipt for Water Use Fee - A744185 - Jun19-18.pdf (185.49 KB) | ||
MV2017L1-0002 - Enbridge Pipelines - Receipt for water use fees - A744183 - Apr16-18.pdf (142.11 KB) | ||
MV2017L1-0002 - Enbridge Pipelines - Acceptance of Security Deposit - GNWT-ENR - Apr12-18.pdf (111.17 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017L1-0002 - Enbridge Pipelines - Request for comments on Request for SNP Revisions from ENR - Mar15-18.pdf (406.66 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 Linked with MV2017L1-0002 - Enbridge - Staff Report for Section 22-2-b - May25-17.pdf (139.55 KB) |