Enbridge Pipelines (NW) Inc. - MV2017L1-0002
Line 21 pipeline replacement (Norman Wells to Zama) near kilometre post (KP) 529 (the project). The project is located near the Mackenzie River, approximately 9 kilometres east of the village of Fort Simpson, in the Dehcho Region of the Northwest Territories.
Note that the pipeline crossing is a segment replacement project for an existing pipeline that is regulated by the National Energy Board (NEB). The replacement segment to be constructed will cross underneath the Mackenzie River at an anticipated depth of 90-110 metres below the river bed. The construction work sites on either side of the river crossing will be above the oridinary high water mark. An application for the project was filed with the NEB on March 10, 2017 and is accessible on the NEBs Public Registry at https://apps.neb-one.gc.ca/REGDOCS/Home/Index.
Associated Land Use Permit: MV2017P0013Documents
- All Issuances (2)
- Annual Reports (13)
- Application and Related Docs (23)
- Consultations - Reviews - Work Plans (37)
- Engagement Plan (3)
- Further Study Requested Sec. 22.2.b (1)
- GIS Data (1)
- Inspection Reports (1)
- Interim Closure and Reclamation Plan (4)
- Operations and Notifications (1)
- Preliminary Screening (5)
- Progress Reports (1)
- Public Hearing (76)
- Security and Water Use Fees (4)
- Sediment and Erosion Control (4)
- Shapefiles (1)
- SNP Program (1)
- Spill - Contingency - Emergency Response (4)
- Technical Session (1)
- Waste Management Plan (6)
- Water Management (7)
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 and MV2017L1-0002 - Enbridge Pipelines - Pre-hearing Conference Agenda - Aug25-17.pdf (550.03 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 MV2017L1-0002 - Enbridge - Public Hearing Transcript - Day 2 of 2 - Oct27-17 V2.pdf (1.42 MB) | ||
MV2017P0013 MV2017L1-0002 - Enbridge - Public Hearing Transcript - Day 1 of 2 - Oct27-17 V1.pdf (2.35 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
Enbridge Pipelines - May 19, 2023 Inspection Report - June 14_23.pdf (1.68 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Spring 2018 Newsletter - Mar 15_18.pdf (3.74 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
Enbridge Pipelines - Post-Construction Environmental Monitoring Report Year 5 (2023) - Dec 7_23.pdf (1.77 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017L1-0002 - Enbridge Pipelines - Engagement Plan - Staff Report and Comments - Apr12-18.pdf (448.18 KB) | ||
MV2017L1-0002 - Enbridge Pipelines - Engagement Plan V1-2 Approval Letter - Apr12-18.pdf (377.46 KB) | ||
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Engagement Plan V1.2 - Feb 22_18.pdf (224.27 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017L1-0002 - Enbridge - SECP - Staff Report and Comments - June 20_18.pdf (771.31 KB) | ||
MV2017L1-0002 – Enbridge Pipelines (NW) Inc. – Sediment and Erosion Control Plan V1.1 – Approval – June20_18.pdf (272.45 KB) | ||
Enbridge Pipelines - Request for comments on the Sediment and Erosion Control plan - May10-18.pdf (388.76 KB) | ||
MV2017L1-0002 - Enbridge Pipelines - Sediment and Erosion Control plan - Apr18-18.pdf (4.47 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017L1-0002 - Enbridge Pipelines - Spill Contingency Plan - Staff Report and Comments - Apr12-18.pdf (412.76 KB) | ||
MV2017L1-0002 - Enbridge Pipelines - Spill Contingency Plan V1 Approval Letter - Arp12-18.pdf (379.13 KB) | ||
MV2017L1-0002 - Enbridge Pipelines - Request for comments on SCP - Mar13-18.pdf (375.61 KB) | ||
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Spill Contingency Plan V.1 - Mar 23_17.pdf (10.75 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017L1-0002 - Enbridge Pipelines - C and R Plan - Version 1 - Approval Letter - May24-18.pdf (151.19 KB) | ||
MV2017L1-0002 - Enbridge Pipelines - C and R Plan - Version 1- Staff Report and Comments - May24-18.pdf (778.34 KB) | ||
MV2017L1-0002 - Enbridge Pipelines - Closure and Reclamation Plan V.1 - Mar 29_18.pdf (12.98 MB) | ||
MV2017L1-0002 - Enbridge Pipelines - Closure and Reclamation Plan V.1 - ORS Notification - Apr 4_18.pdf (68.58 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Updated GIS Data - Apr 25_17.zip (14.29 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Zip File - GIS Data - Apr25-17.zip (14.29 KB) |