Skip to main content

Kerry Smith - W2022W0005

​(This Permit was previously permitted under Permits W2015W0007, W2008W0012, and MV2003W0020). The Project is for a Wood Cutting Operation and is located at Km 172.5 on Highway 3, NT.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 3 of 3
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
Kerry Smith - Land Use Inspection Report - October 8 2024 - Oct 9_24.pdf (9.66 MB)
Kerry Smith - Land Use Inspection Report - September 27 2023 - Sep 28_23.pdf (5.45 MB)
Kerry Smith - Land Use Inspection Report - September 22 2022 - Sep 26_22.pdf (5.11 MB)