Arctic Canadian Diamond Company Ltd. - W2022L2-0001


​Diamond mining and milling at the Ekati Mine. Water Use and Waste Disposal.

The Renewal application includes proposed water use from Upper Exeter Lake, Ursula Lake, Lac de Gras, and Lac du Sauvage, and an underwater remote mining trial at Lynx Pit.


The current Licence (W2020L2-0004) contains scope as described below:


a) Subject to the terms and conditions of this Licence, the Licensee may divert water from Upper Panda Lake to Kodiak Lake, and use water and dispose of Waste for the purpose of mining the Panda, Koala, Koala North, Misery, and Fox kimberlite pipes, for operating the processing facilities and related infrastructure, and carrying out Reclamation associated with diamond mining within the Koala, Misery, King-Cujo, Desperation-Carrie, and Lac du Sauvage Watersheds of the Lac de Gras basin, Northwest Territories.

This Licence entitles the Licensee to use water, Dewater Sable, Pigeon, and Beartooth Lakes for the purpose of mining, to Drawdown Two Rock Lake, divert Pigeon Stream around the Pigeon pit, pipe water from Bearclaw Lake outflow around Beartooth pit, and deposit Processed Kimberlite into a Processed Kimberlite Containment Area for the purpose of creating a pit lake. The Licensee may also dispose of Waste for industrial undertakings in diamond mining and processing, production, Reclamation and associated uses in the Koala, Pigeon, and Sable watersheds, Northwest Territories as shown on Figure 6, 8, & 10 of the Class A Water Licence and Land Use Permits supporting documents, submitted August 21, 2001.

This Licence entitles the Licensee to Dewater Lynx Lake, use water, dispose of Waste, and divert runoff around the Lynx pit, for the purposes of mining the Lynx kimberlite pipe and carrying out Reclamation of the Lynx Development.This Licence also entitles the Licensee to use water, dispose of Waste, and divert Groundwater inflows for the purposes of underground mining of the Misery kimberlite pipe and carrying out Reclamation of the Misery Underground Development, as described in the Application submitted August 15, 2017 and the additional information submitted during the regulatory process.This Licence also entitles the Licensee to Dewater Point Lake, use water, and dispose of Waste, for the purposes of mining the Point Lake, Phoenix and Challenge kimberlite pipes and carrying out Reclamation of the Point Lake Development.

The activities listed above are to be conducted as described in the relevant portions of the approved Environmental Impact Assessments and determinations made under Part 5 of the MVRMA.


Uploaded On or After
Uploaded On or Before
Displaying 101 - 200 of 217
3. Amendment Application
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
Ekati - Sable UG - Work Plan - Version 1 - May 10_24.pdf (277.49 KB)
Ekati - Sable UG - Work Plan - Draft - Apr 24_24.pdf (295.87 KB)
Preliminary Screening
Document Received/Sent Uploaded
Ekati - Sable UG - Preliminary Screening - Determination and Reasons for Decision - Jun 28_24.pdf (596.54 KB)
Public Hearing
Document Received/Sent Uploaded
Ekati - Sable UG - Licence Amendment - Arctic - Public Hearing Presentation - Sep 18_24.pdf (1.74 MB)
Ekati - Sable UG - Licence Amendment - ECCC - Public Hearing Presentation - Sep 16_24.pdf (562.08 KB)
Ekati - Sable UG - Licence Amendment - IEMA - Public Hearing Presentation - Sep 13_24.pdf (1.01 MB)
Ekati - Sable UG - Licence Amendment - GNWT-ECC - Public Hearing Presentation - Sep 13_24.pdf (505.8 KB)
Ekati - Sable UG - Licence Amendment - Tłı̨chǫ Government - Public Hearing Presentation - Sep 16_24.pdf (2.14 MB)
Ekati - Sable UG - Licence Amendment - Arctic - Response to Interventions - Sep 12_24.pdf (2.65 MB)
Ekati - Sable UG - Licence Amendment - Public Hearing - Agenda - Sep 12_24.pdf (355.53 KB)
Ekati - Sable UG - Licence Amendment - GNWT-ECC - Intervention - Sep 4_24.pdf (202.44 KB)
Ekati - Sable UG - Licence Amendment - Tłı̨chǫ Government - Intervention - Sep 4_24.pdf (322.64 KB)
Ekati - Sable UG - Licence Amendment - ECCC - Intervention - Sep 4_24.pdf (651.71 KB)
Ekati - Sable UG - Licence Amendment - IEMA - Intervention - Sep 4_24.pdf (268.8 KB)
Ekati - Sable UG - Licence Amendment - Newspaper Notice of Public Hearing - Aug 19_24.pdf (147.37 KB)
Ekati - Sable UG - Licence Amendment - Pre-Hearing Conference - Agenda - Aug 15_24.pdf (232.33 KB)
Technical Session
Document Received/Sent Uploaded
Ekati - Licence - Amendment - Technical Session - Arctic Response to IR 2 and 10 and update to IR 9 - Aug 14_24.pdf (6.67 MB)
Ekati - Licence - Amendment - Technical Session -IR 2 and 10 Extension Request - Aug 6_24.pdf (217.11 KB)
Ekati - Licence - Amendment - Technical Session - Arctic Response to Information Requests - Jul 31_24.pdf (1.01 MB)
Ekati - Sable UG - Information Request 10 - Jul 31_24.pdf (246.43 KB)
Ekati - Sable UG - Technical Session - Transcripts - Day 2 - Jul 25_24.pdf (1.43 MB)
Ekati - Sable UG - Technical Session - Transcripts - Day 1 - Jul 25_24.pdf (1.73 MB)
Ekati - Licence - Amendment - Technical Session - Information Requests - Jul 24_24.pdf (173.79 KB)
Ekati - Sable UG - Technical Session - Arctic Presentation - Jul 22_24.pdf (4.22 MB)
Ekati - Sable UG - Technical Session - Agenda - Jul 10_24.pdf (295.59 KB)
Withdrawal - Return - Denial
Document Received/Sent Uploaded
Ekati - Sable UG - Amendment Application - Notice of Withdrawal - Sep 24_24.pdf (184.67 KB)
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
Ekati - 2023 Annual Report - EA and WL Plain Language Summary - Apr 30_24.pdf (5.35 MB)
Ekati - 2023 Annual Report - Appendix E WEMP Summary - Apr 30_24.pdf (1.13 MB)
Ekati - 2023 Annual Report - Appendix H Annual Closure and Reclamation Progress Report - Apr 30_24.pdf (81.26 MB)
Ekati - 2023 Annual Report - EA and WL Report Cover Letter - Apr 30_24.pdf (201.01 KB)
Ekati - 2023 Annual Report - Appendix A and B SNP Summary and AEMP Summary - Apr 30_24.pdf (2.2 MB)
Ekati - 2023 Annual Report - Appendix C Spills and Non-compliance - Apr 30_24.pdf (25.11 MB)
Ekati - 2023 Annual Report - Appendix F Annual Geotechnical Inspection Report - Apr 30_24.pdf (19.39 MB)
Ekati - 2023 Annual Report - Appendix G Annual Seepage Report - Apr 30_24.pdf (179.9 MB)
Ekati - 2023 Annual Report - Appendix I 2022 Annual Report Comments - Apr 30_24.pdf (708.61 KB)
Ekati - 2023 Annual Report - EA and WL Report - Apr 30_24.pdf (2.06 MB)
Ekati - 2023 Annual Report - Appendix D Air Quality Program Monitoring Report - Apr 30_24.pdf (216.13 MB)
Designs and As-Builts
Document Received/Sent Uploaded
Ekati - Sable WRSA - Sable WRSA Design Report V 3.0 Retraction - May 16_24.pdf (155.98 KB)
Inspection Reports
Document Received/Sent Uploaded
Ekati - Water Licence Inspection Report - October November 2024 - Dec 6_24.pdf (9.95 MB)
Ekati - Water Licence Inspection Report - August and September 2024 - Oct 10_24.pdf (14.29 MB)
Ekati - Water Licence Inspection Report - June 18 2024 - Jul 11_24.pdf (6.4 MB)
Ekati - Water Licence Inspection Report - December 13 2024 - Jan 12_24.pdf (3.58 MB)
Operations and Notifications
Document Received/Sent Uploaded
Ekati - 2024 TRSP to Horseshoe Lake Pumping Summary - Data - Nov 9_24.pdf (8.97 MB)
Ekati - 2024 TRSP to Horseshoe Lake Pumping Summary - Nov 9_24.pdf (133.55 KB)
Ekati - Water Quality Exceedence - KPSF to Cujo Lake July 2024 - Follow up Report - Oct 19_24.pdf (4.14 MB)
Ekati - 2024 KPSF to Cujo Lake Pumping Summary - Sep 21_24.pdf (11.4 MB)
Ekati - Water Quality Exceedance - KPSF to Cujo Lake - July 2024 - Aug 01_24.pdf (6.42 MB)
Ekati - Notification - Transferring water from Bear Claw Lake to Panda North Lake - Jul 5_24.pdf (227.66 KB)
Ekati - Request for Authorization to Discharge - TRSP to Horseshoe Lake - Jun 20_24.pdf (1.19 MB)
Ekati - Authorization to Discharge Water From King Pond - Jun 24_24.pdf (170.95 KB)
Ekati - Authorization to Discharge Water From TRSP to Horseshoe and Road Watering - Jun 20_24.pdf (190.53 KB)
Ekati -Request for Authorization - TRSP - Road Watering and Discharge - Jun 20_24.pdf (1.23 MB)
Ekati - Spill Report - Detailed Spill Report– Spill-2024111 - May 19_24.pdf (206.59 KB)
Ekati - Overburden Stockpile Seepage and Runoff - Reasons for Decision - April 26_24.pdf (447.2 KB)
Ekati - Detailed Spill Report– Spill-2024078 - Apr 25_24.pdf (403.93 KB)
Ekati - Overburden Stockpile Seepage and Runoff - Request to Board - Follow-up Correspondence - Apr 18_24.pdf (306.35 KB)
Ekati - Spill Report - Detailed Spill Report - 2023527 - Jan 14_24.pdf (213.17 KB)
Ekati - Detailed Spill Report - Spill 2024044 - Mar 14_24.pdf (213 KB)
Ekati - Sable Development Pad Extension - IEMA Letter to GNWT-ECC - Mar 19_24.pdf (166.52 KB)
Ekati - Point Lake Seepage Collection System Notification - Mar 22_24.pdf (475.02 KB)
Ekati - Overburden Stockpile Seepage and Runoff - Request to Board- Feb 23_24.pdf (224.74 KB)
Ekati - Sable Development Pad Extension - Request to Inspector and Inspector Approval - Feb 2_24.pdf (2.51 MB)
Other
Document Received/Sent Uploaded
Ekati - Dam Classification Assessment Report - Nov 13_24.pdf (18.87 MB)
Ekati - Board Letter to Arctic - Annual Geotechnical Reports (2022 and 2023) and 2023 DSRs - Oct 18_24.pdf (190.91 KB)
Ekati - Dam Safety Review Reports - Long Lake Outlet and Panda Dams - Aug 28_24.pdf (15.68 MB)
Arctic - Point Lake Stage 2 Dewatering Wildlife Monitoring Report - Apr 23_24.pdf (2.16 MB)
Arctic - WEMP - 2023 Annual Report - Apr 1_24.pdf (47.61 MB)
SNP Reports
Document Received/Sent Uploaded
Ekati - SNP Report - October 2024 - Nov 27_24.pdf (4.39 MB)
Ekati - SNP Report - September 2024 - Oct 30_24.pdf (20.89 MB)
Ekati - SNP Report - August 2024 - Oct 1_24.pdf (9.89 MB)
Ekati - SNP Report - July 2024 - Aug 28_24.pdf (10.76 MB)
Ekati - SNP Report - June 2024 - Jul 30_24.pdf (11.01 MB)
Ekati - SNP Report - May 2024 - Jun 30_24.pdf (23.81 MB)
Ekati - SNP Report - April 2024 - May 31_24.pdf (1.19 MB)
Ekati - SNP Report - March 2024 - Apr 30_24.pdf (2.32 MB)
Ekati - SNP Report - February 2024 - Mar 31_24.pdf (1.04 MB)
Ekati - SNP Report - January 2024 - Feb 29_24.pdf (974.61 KB)
Ekati - SNP Report - December 2023 - Jan 31_24.pdf (2.6 MB)
Ekati - SNP Report - November 2023 - Jan 2_24.pdf (2.77 MB)
Waste Rock and Seepage
Document Received/Sent Uploaded
Ekati - 2022 WRSA 3-Year Seepage Program Report - Reasons for Decision - Jan 31_24.pdf (498.43 KB)
6. Management Plans
Waste Rock and Tailings Management
Document Received/Sent Uploaded
Ekati - WROMP - Version 13.0 - Sep 26_24.pdf (19.82 MB)
Ekati - WROMP - Seepage Response Framework V 1.0 - Reasons for Decision - Aug 28_24.pdf (405.61 KB)
Ekati - WPKMP - King Pond Discharge Contingency Plan - May 1_24.pdf (221.46 KB)
Ekati - WROMP - Seepage Response Framework - V 1.0 - May 6_24.pdf (12.73 MB)
Ekati - WPKMP - Request for Extension for King Pond Discharge Contingency Plan - Apr 15_24.pdf (169.04 KB)
Ekati - WPKMP - Request for Extension for King Pond Discharge Contingency Plan - Decision Letter - Apr 24_24.pdf (223.48 KB)
Ekati - WROMP - Version 12.1 - Mar 6_24.pdf (18.75 MB)
Ekati - WROMP - Version 12.1 - Conformity Confirmation - Mar 7_24.pdf (179.28 KB)
Ekati - WPKMP - Version 10.1 - Mar 5_24.pdf (3.68 MB)
Ekati - WPKMP - Version 10.1 - Conformity Confirmation - Mar 5_ 24.pdf (180.04 KB)
Ekati - WPKMP - Version 10 - Reasons for Decision - Mar 1_24.pdf (368.67 KB)
Ekati - WROMP - Version 12.0 - Reasons for Decision - Jan 31_24.pdf (454.84 KB)
Ekati - WPKMP Version 10 - Dec 22_23.pdf (3.84 MB)
7. Monitoring Programs
AEMP - Annual Report
Document Received/Sent Uploaded
Ekati - AEMP - 2023 Annual Report - Kodiak Lake Mercury Investigation - Update - Sep 26_24.pdf (8.63 MB)
Ekati - AEMP - 2023 Annual Report - Reasons for Decision - Aug 28_24.pdf (392.34 KB)
Ekati - AEMP - 2023 Annual Report - Kodiak Lake Mercury Investigation - May 15_24.pdf (8.28 MB)
Ekati - AEMP - 2023 Annual Report - Part 1 Annual Report - Appendices - Apr 1_24.pdf (15.2 MB)
Ekati - AEMP - 2023 Annual Report - Part 1 Annual Report - Apr 1_24.pdf (21.61 MB)
Ekati - AEMP - 2023 Annual Report - Data File - Apr 1_24.xlsx (374.56 KB)
Ekati - AEMP - 2023 Annual Report - HTML Files - Apr 1_24.zip (19.42 MB)