Imperial Oil Resources N.W.T. Limited - S24L1-002

Imperial Oil Resources N.W.T. Limited (Imperial) has applied for a new Water Licence and Land Use Permit ​to install flowlines using Horizontal Directional Drilling (HDD) between Goose and Bear Islands, located in the Mackenzie River at Norman Wells, NT.  The HDD equipment is expected to be mobilized to site in February 2025. The Project is expected to begin in June and be completed by August 2025. This work is being conducted to replace the shut-in Line 490 which failed in July 2022, and to resume full production at the Norman Wells Operation.

The HDD will drill a single hole (diameter 24-30"; approximately 1.0-1.5 km length) between Goose and Bear Islands, at least 15 meters below the riverbed. This depth gives the flowlines vertical separation from the Mackenzie River to minimize the risk of future line exposure. 

Imperial will use water from its existing water Licence (S13L1-007) and expected renewal Licence in March 2025, for the Project. The waste generated for this Project will consist of garbage (packaging, oily rags, etc.), drilling waste from the HDD, and hydrostatic test water. 

Uploaded On or After
Uploaded On or Before
Displaying 1 - 50 of 50
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
S24L1-002 - CER Files - OH-001-2023 - Letters of Comment.zip (19.55 MB)
S24A-005 - S24L1-002 - C29876-3 - OH-001-2023 - Updated Issue Summary Log - May_24.pdf (117.24 KB)
S24A-005 - S24L1-002 - C30058-2 - OH-001-2023 - Response to CER Information - Request No.5 - Nov1_23.pdf (358.73 KB)
S24A-005 - S24L1-002 - C30845-1 - OH-001-2023 - Commission Ruling No.8 - Jul29_24.pdf (240.72 KB)
S24A-005 - S24L1-002 - C28800-25 - OH-001-2023 - Summary of Concerns.pdf (423.24 KB)
S24A-005 - S24L1-002 - C30739-1 - OH-001-2023 - Letter - Jul18_24.pdf (266.46 KB)
S24A-005 - S24L1-002 - C29876-2 - OH-001-2023 - IOL to CER IR No. 4 - Nov1_23.pdf (489.7 KB)
S24A-005 - S24L1-002 - C29304-2 - OH-001-2023 - Response to CER Information Request No. 3 - Feb6_24.pdf (242.55 KB)
S24A-005 - S24L1-002 - C29626-2 - OH-001-2023 - IOL Responses to KGC Information Requests - May6_24.pdf (457.45 KB)
S24A-005 - S24L1-002 - C30739-2 - OH-001-2023 - Reply to KGC - Motion to Compel Table.pdf (228.39 KB)
S24L1-002 - CER Hearing Transcript - Volume 1 - OH-001-2023 - May15_24.pdf (743.67 KB)
S24L1-002 - CER Hearing Transcript - Volume 2 - OH-001-2023 - May16_24.pdf (979.63 KB)
S24L1-005 - CER Hearing Transcript - Volume 3 - OH-001-2023 - May17_24.pdf (767.02 KB)
S24L1-002 - CER Hearing Transcript - Volume 4 - OH-001-2023 - Jun11_24.pdf (507.19 KB)
Imperial - Flowline Replacement - Project Cover Letter - May 1_24.pdf (346.59 KB)
Imperial - Flowline Replacement - Attachment 01 - Land Use Permit Application - May 1_24.pdf (653.97 KB)
Imperial - Flowline Replacement - Attachment 02 - Water Licence Application - May 1_24pdf.pdf (660.95 KB)
Imperial - Flowline Replacement - Attachment 03 - HDD Plan and Profile - May 1_24.pdf (2.77 MB)
Imperial - Flowline Replacement - Attachment 04 - Replacement Activities Location Map - May 1_24.pdf (3.19 MB)
Imperial - Flowline Replacement - Attachment 05 - Environmental Protection Plan - May 1_24.pdf (420.11 KB)
Imperial - Flowline Replacement - Attachment 06 - Closure Cost Estimate - May 1_24.pdf (67.03 KB)
Imperial - Flowline Replacement - Attachment 07 - Engagement Record and Plan Summary - May 1_24.pdf (761.9 KB)
Imperial - Flowline Replacement - Attachment 08 - Land Titles - May 1_24.pdf (1.98 MB)
Imperial - Flowline Replacement - Attachment 09 - Proof of Incorporation - May 1_24.pdf (509.99 KB)
Imperial - Flowline Replacement - Attachment 10 - Environmental Interactions Table - May 1_24.pdf (416.9 KB)
S24L1-002 - Flowline Replacement - Licence - New Application - Incomplete Letter - May 09_24.pdf (390.78 KB)
S24L1-002 - WL Application Fee - May 22_22.pdf (14.48 KB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S24A-005 - S24L1-002 - Reviewer Comments on Draft LUP and WL - Sep24_24.pdf (133.92 KB)
S24A-005 - S24L1-002 - Reviewer Comments and Proponent Responses on Application_Aug30_24.pdf (145.38 KB)
S24A-005 - S24L1-002 - KGC Comments on Draft LUP and WL Conditions_Sep24_24.pdf (384.13 KB)
S24A-005 - S24L1-002 - KGC Comment Letter to SLWB on Application_Jul17_24.pdf (332.22 KB)
S24A-005 - S24L1-002 - KGC Comment Letter to SLWB on Application_Aug20-24.pdf (388.26 KB)
S24L1-002 - Imperial - Flowline Replacement - Licence - DRAFT LICENCE.pdf (460 KB)
S24L1-002 - IOL to SLWB - Letter of Comment re KGC Communication - July30_24.pdf (334.4 KB)
S24L1-002_S24A-005 - SLWB Letter response to FGH K'ahsho Got'ine Committee - Jul 23_24.pdf (217.11 KB)
S24A-005 - S24L1-002 - Letter of Support - Goose to Bear Island Flowline Replacement Project_Jul 2_24.pdf (318.18 KB)
Environmental Assessment
Document Received/Sent Uploaded
S24L1-002 - MVRB Notice of Environmental Assessment_Sep25_24.pdf (266.37 KB)
S24L1-002 - SLWB Notice of Suspension of Regulatory Process_Sep25_24.pdf (477.11 KB)
9. GIS Data
GIS Data
Document Received/Sent Uploaded
Imperial - Flowline Replacement - GIS_cpg.file Mackenzie River HDD RevA - May 24_24.cpg (4 bytes)
Imperial - Flowline Replacement - GIS_cpg.file Mackenzie River HDD Workspaces - May 24_24.cpg (4 bytes)
Imperial - Flowline Replacement - GIS_dbf.file Mackenzie River HDD RevA - May 24_24.dbf (11.52 KB)
Imperial - Flowline Replacement - GIS_dbf.file Mackenzie River HDD Workspaces - May 24_24.dbf (576 bytes)
Imperial - Flowline Replacement - GIS_idx.file Mackenzie River HDD RevA - May 24_24.idx (3.13 KB)
Imperial - Flowline Replacement - GIS_idx.file Mackenzie River HDD Workspaces - May 24_24.idx (1.02 KB)
Imperial - Flowline Replacement - GIS_prj.file Mackenzie River HDD RevA - May 24_24.prj (459 bytes)
Imperial - Flowline Replacement - GIS_prj.file Mackenzie River HDD Workspaces - May 24_24.prj (459 bytes)
Imperial - Flowline Replacement - GIS_shp.file Mackenzie River HDD RevA - May 24_24.shp (10.01 KB)
Imperial - Flowline Replacement - GIS_shp.file Mackenzie River HDD Workspaces - May 24_24.shp (1.25 KB)
Imperial - Flowline Replacement - GIS_shx.file Mackenzie River HDD RevA - May 24_24.shx (468 bytes)
Imperial - Flowline Replacement - GIS_shx.file Mackenzie River HDD Workspaces - May 24_24.shx (116 bytes)