Skip to main content

GNWT-INF (Sahtu) - S24E-006

The Project includes the relocation of the Oscar Creek Bridge located at KM1054.4 of the Mackenzie Valley Winter Road (MVWR) to a location 2.9 kilometers (km) to the east (upstream), and re-alignment of the MVWR from approximately KM1051 to KM1056 to connect with the new bridge location 


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
2. Initial/Renewal Application
Preliminary Screening
Document Received/Sent Uploaded
S24E-006 - S24L8-003 - Preliminary Screening Determination and Notification - Aug23_24.pdf (1.05 MB)