Skip to main content

GNWT-INF (Sahtu) - S24E-006

The Project includes the relocation of the Oscar Creek Bridge located at KM1054.4 of the Mackenzie Valley Winter Road (MVWR) to a location 2.9 kilometers (km) to the east (upstream), and re-alignment of the MVWR from approximately KM1051 to KM1056 to connect with the new bridge location 


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
2. Initial/Renewal Application
Further Study Requested Sec. 22.2.b
Document Received/Sent Uploaded
S24E-006 -GNWT-INF - Letter - Notice of 22(2)(b) Timeline Pause - June 25_24.pdf (203.89 KB)
S24E-006 - GNWT-INF - Permit - 22(2)(b) Timeline Pause - Staff Report_June 25_24.pdf (418.91 KB)