Skip to main content

GNWT-INF (Sahtu) - S20S-002

​GNWT-INF is proposing to undertake a geotechnical assessment to characterize subsurface conditions at the existing water crossing at 12 Mile Creek, located 14 km east of Tulita, NT. The results of the assessment will be used to inform the design and construction of a new water crossing. 

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
S20S-002 - 12 Mile Creek Permafrost and Erosion Mitigation Contingency Plan - Mar 10_20.pdf (500.7 KB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
S20S-002 - 12-Mile Creek Spill Contingency Plan version 1.1 - Mar 10_20.pdf (1.68 MB)
S20S-002 - 12 Mile Creek Bridge Geotechnical Spill Contingency Plan - Jan 17_20.pdf (1.65 MB)
Waste Management Plan
Document Received/Sent Uploaded
S20S-002 - 12-Mile Creek Waste Managment Plan version 1.1 - Mar 10_20.pdf (420.77 KB)
S20S-002 - 12 Mile Creek Bridge Geotechnical Waste Managment Plan - Jan 17_20.pdf (951.31 KB)