Skip to main content

GNWT-INF (Sahtu) - S20S-001

​INF is planning to construct a 13 kilometer all-season access road between Canyon Creek and Prohibition Creek, along the existing winter road alignment. The project is located southeast of Norman Wells, NT. A geotechnical assessment program is required to characterize subsurface conditions to inform and support engineering design for the future construction of the access road. The project is anticipated to be completed in the winter of 2020 with a minimum of 14 boreholes.  No camp is required and water use will be below the threshold required for a Licence.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 9 of 9
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
S20S-001 - Permafrost and Erosion Mitigation Contingency Plan - Mar 10_20.pdf (1.9 MB)
S20S-001 - PCAR Taditional Environmental Knowledge Report - Jan 10_20.pdf (3.97 MB)
S20S-001 - PCAR Archaeological Overview Assessment - Jan 10_20.pdf (1.79 MB)
S20S-001 - PCAR Den and Nest Survey Report - Jan 10_20.pdf (1.47 MB)
Engagement Plan
Document Received/Sent Uploaded
S20S-001 - PCAR Engagement Plan and Record - Jan 10_20.pdf (2.05 MB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
S20S-001 - PCAR Spill Contingency Plan version 1.1 - Mar 10_20.pdf (3.88 MB)
S20S-001 - PCAR Spill Contingency Plan - Jan 10_20.pdf (1.79 MB)
Waste Management Plan
Document Received/Sent Uploaded
S20S-001 - PCAR Waste Management Plan version 1.1 - Mar 10_20.pdf (2.61 MB)
S20S-001 - PCAR Waste Management Plan - Jan 10_20.pdf (1.17 MB)