Skip to main content

GNWT-INF (Sahtu) - S20S-001

​INF is planning to construct a 13 kilometer all-season access road between Canyon Creek and Prohibition Creek, along the existing winter road alignment. The project is located southeast of Norman Wells, NT. A geotechnical assessment program is required to characterize subsurface conditions to inform and support engineering design for the future construction of the access road. The project is anticipated to be completed in the winter of 2020 with a minimum of 14 boreholes.  No camp is required and water use will be below the threshold required for a Licence.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
6. Management Plans
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
S20S-001 - PCAR Spill Contingency Plan version 1.1 - Mar 10_20.pdf (3.88 MB)
S20S-001 - PCAR Spill Contingency Plan - Jan 10_20.pdf (1.79 MB)