Skip to main content

GNWT-INF (Sahtu) - S20L8-002

​GNWT-INF has planned to construct a 13 Km all-season access road from the southern end of the Canyon Creek All-Season Access Road (CCASAR) to the Prohibition Creek. This project includes the operation of a quarry (Edie Lake Quarry). No camp is required for the project.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 16 of 16
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
S20L8-002 - Inspector Authorization for Gabion Baskets at Hellava and Francis Creek - Jun 20_23.pdf (325.28 KB)
S20L8-002 - PCAR Maps - Nov 19_20.pdf (8.99 MB)
S20E-005 - S20L8-002 - Disposal of Solid Waste in Norman Wells Landfill - Oct 19_20.pdf (176.49 KB)
S20L8-002 - PCAR Construction Project - Water Licence Application - Sep 18_20.pdf (451.03 KB)
S20L8-002 - Appendix C - Sewage Waste Disposal - Permission from Town of Norman Wells - Sep 14_20.pdf (935.37 KB)
S20L8-002 - Appendix D - Letters of Support - Sep 14_20.pdf (1.32 MB)
S20L8-002 - Appendix F - Edie Lake Geotechnical Assesement Report - Sep 14_20.pdf (4.37 MB)
S20L8-002 - Appendix H - Environmental Overview with TK Studies - Sep 14_20.pdf (8.33 MB)
S20L8-002 - Cover Letter - PCAR Construction Project - Sep 14_20.pdf (290.97 KB)
S20L8-002 - Projection Description Report with EPP and SLUP Conformity - PCAR Construction Project - Sep 14_20.pdf (5.31 MB)
3. Amendment Application
Application and Related Docs
Document Received/Sent Uploaded
S20L8-002 - AMEND - 5. DRAFT Licence Conditions - Apr 27_23.pdf (316.53 KB)
S20L8-002 - AMEND - 1. Cover Letter - Apr 27_23.pdf (474.27 KB)
S20L8-002 - AMEND - 2. Application and Appendix C - Apr 27_23.pdf (607.27 KB)
S20L8-002 - AMEND - 3. Engagement - Apr 27_23.pdf (501.9 KB)
S20L8-002 - AMEND - 4. Appendix B - Apr 27_23.pdf (5.9 MB)
S20L8-002 - Amend Application for Water Sources - Mar 30_23.pdf (6.5 MB)