Skip to main content

Enbridge Pipelines (NW) Inc. - S20L1-001

​Enbridge Pipelines (NW) Inc. (Enbridge) is proposing to replace a segment of the Line 21 pipeline southeast of kilometre post (KP) 158 near Little Smith Creek in the Northwest Territories (NWT). A Permit (S20P-003) is required for the use of land for camps, laydown yard, barge landing and temporary workspace, fuel storage, use of heavy equipment and a Licence (S20L1-001) for use of water and waste disposal.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
S20L1-001 - Enbridge Line 21 Pipeline KP158 - Decision Letter - Sep 17_20.pdf (994.76 KB)
S20L1-001 - Water Licence Cover Page - Sep 17_20.pdf (4.23 MB)
S20P-003 - Enbridge Line 21 - Reasons for Decision - Sep 17_20.pdf (847.77 KB)
Security and Water Use Fees
Document Received/Sent Uploaded
S20L1-001 - Letter to Enbridge Pipeline NW Inc - Security Deposit Cheque - Nov 20_20.pdf (500.17 KB)
S20L1-001 - Water Use Fee - Aug 7_20.pdf (34.76 KB)