Skip to main content

Enbridge Pipelines (NW) Inc. - S20L1-001

​Enbridge Pipelines (NW) Inc. (Enbridge) is proposing to replace a segment of the Line 21 pipeline southeast of kilometre post (KP) 158 near Little Smith Creek in the Northwest Territories (NWT). A Permit (S20P-003) is required for the use of land for camps, laydown yard, barge landing and temporary workspace, fuel storage, use of heavy equipment and a Licence (S20L1-001) for use of water and waste disposal.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 7 of 7
2. Initial/Renewal Application
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S20L1-001 - 2022 Annual Water Licence Staff Report - Oct27_23.pdf (3.39 MB)
S20L1-001 - Enbridge NW Response to GNWT Comments - Jun 16_23.pdf (153 KB)
S20L1-001 - Enbridge - Staff Report - Mar 2_22.pdf (455.52 KB)
S20L1-001 - Comment Letter - Mar 3_22.pdf (348.22 KB)
S20L1-001 -Enbridge Line 21 Replacement - KP158 - Staff Report - Aug 28 - Sep 17_20.pdf (2.88 MB)
S20L1-001-Enbridge Line 21 Review Comment Table and attached correspondence - Sep 17_20.pdf (1.52 MB)
S20L1-001 - Enbridge Line 21 Pipeline Replacement Project - Staff Report - Aug -27_20.pdf.pdf (5.35 MB)