Skip to main content

GNWT-INF (Sahtu) - S20E-005

​GNWT-INF has planned to construct a 13 Km all-season access road from the southern end of the Canyon Creek All-Season Access Road (CCASAR) to the Prohibition Creek. This project includes the operation of a quarry (Edie Lake Quarry). No camp is required for the project.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 12 of 12
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
S20E-005 - PCAR Condition 75 Studies Required before Construction - Notification - Dec 1_21.pdf (175.06 KB)
S20E-005 - PCAR Wildlife Management and Monitoring Plan version 2.0 - Dec 3_21.pdf (28.37 MB)
S20E-005 - PCAR Permafrost Protection Plan - version 1.0 - Nov 1_21.pdf (480.83 KB)
S20E-005 - PCAR Wildlife Management and Monitoring Plan - version 1.0 - Nov 1_21.pdf (7.17 MB)
S20E-005 - PPP Cover Letter - Nov 1_21.pdf (48.52 KB)
S20E-005 - PCAR Quarry Operations Plan Ver 1- Sep 23_20.pdf (6.36 MB)
Engagement Plan
Document Received/Sent Uploaded
S20E-005 - Appendix I - Engagement Plan and Record - Sep 14_20.pdf (1.45 MB)
Sediment and Erosion Control
Document Received/Sent Uploaded
S20E-005 - PCAR-Erosion and Sediment Control Plan - version-2.0- Dec 3_21.pdf (430.67 KB)
S20E-005 - PCAR Erosion and Sediment Control Plan - version 1.0 - Nov 1_21.pdf (504.24 KB)
S20E-005 - WMMP and SECP Cover Letter - Oct 29_21.pdf (222.57 KB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
S20E-005 - Spill Contingency Plan Ver 1 - Sep 18_20.pdf (3.89 MB)
Waste Management Plan
Document Received/Sent Uploaded
S20E-005 - Waste Management Plan Ver 1 - Sep 18_20.pdf (1.91 MB)