Skip to main content

Délįnę Got’įnę Government - S18L3-001

Water licence application for the use of water from Great Bear Lake and disposal of sewage and solid waste for municipal purposes in association with municipal operations.

Renewal of S12L3-006.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 18 of 18
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
S18L3-001 - Letter to Municipalitites re annual reports - May 12_23[35].pdf (226.06 KB)
S18L3-001 - Deline - 2017-2020 Annual Water Licence Reports - Staff Information Report and Review Comment Summary - 2022.pdf (738.94 KB)
S18L3-001 - Deline GG - Annual Water Licence Reports - Board Direction - Jul 15_22.pdf (244.16 KB)
S18L3-001 - 2017 Annual Water Licence Report - Oct 29_21.pdf (7.68 MB)
S18L3-001 - 2018 Annual Water Licence Report - Oct 29_21.pdf (15.57 MB)
S18L3-001 - 2019 Annual Water Licence Report - Oct 29_21.pdf (8.33 MB)
S18L3-001 - 2020 Annual Water Licence Report - Oct 29_21.pdf (9.47 MB)
S18L3-001 - Annual Report Template - Municipal Water Licence - Deline - Aug 5_20.pdf (623.24 KB)
Designs and As-Builts
Document Received/Sent Uploaded
S18L3-001 - S12L3-006 - Final Design Drawing Issued for Construction- Deline Municipal Solid Waste Drawings - Oct 03_12.pdf (621.57 KB)
Inspection Reports
Document Received/Sent Uploaded
S18L3-001 - Deline Licence Inspection - Oct 5 2021 - not submitted until Dec 1_22.pdf (6.14 MB)
S18L3-001 - Inspection Report_Aug 24_22.pdf (2.96 MB)
S18L3-001 - Inspector's Letter - Usage of Incinerators at the New Solid Waste Facility - Oct 7_20.pdf (156.07 KB)
S18L3-001 - Deline Water Licence Inspection Report - Aug 26_20.pdf (1.18 MB)
S18L3-001 - ENR Inspection Report for June 8 2018 - June 14_18.pdf (1.35 MB)
Operations and Notifications
Document Received/Sent Uploaded
S18L3-001 - E-mails - New SWF Construction - Final Design Drawing - O and M Plan Updates - Jun 5-16 _20.pdf (246.52 KB)
S18L3-001 - SLWB letter to Deline compliance concerns - May 31_19.pdf (984.84 KB)
Other
Document Received/Sent Uploaded
S18L3-001 - E-mails - Solid Disposal Facility - O and M Plan to be updated - Final Design Drawing - Oct 10-Oct 16_19.pdf (228.21 KB)
S18L3-001 - E-mail conversations - Reg inquiries on Hazardous Waste and Composting Facilities - May 26 to May 29_20.pdf (185.61 KB)