Enbridge Pipelines (NW) Inc. - S17P-005
Status:
Closed
Authorization:
Land Use Permit
Activity:
Pipeline
Start:
February 7, 2018
Expiry:
February 6, 2020
Staff:
Bonnie Bergsma
Enbridge Pipelines (NW) Inc. is proposing to conduct Line 21 pipeline maintenance digs within the Saline River (KP 180.168 and KP 180.280). All excavation activities will be contained within Enbridge's existing right-of-way (MV2013P0011) however additional off-right-of-way land is required for temporary work space to accommodate vehicle and equipment staging, temporary material storage and excavation isolation activities. The Project will involve a watercourse crossing and there is the potential for a channel diversion. The associated application for a Type B Water Licence is S17L1-004. |
Displaying 1 - 4 of 4
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 S17P-005 - Revised WMP and SECP - Staff Conformity Confirmation - Feb 16_18.pdf (334.61 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17P-005 S17L1-004 - Enbridge - Spill Contingency Plan - Version 1.1 - Feb 16_18.pdf (12.6 MB) | ||
S17P-005 S17L1-004 - Staff Confirmation of Conformity - Spill Contingency Plan - Feb 19_18.pdf (283.9 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17P-005 S17L1-004 - Enbridge - Revised Waste Management Plan - Version 1.1 - Feb 15_18.pdf (3.35 MB) |