Skip to main content

Enbridge Pipelines (NW) Inc. - S17P-005

Enbridge Pipelines (NW) Inc. is proposing to conduct Line 21 pipeline maintenance digs within the Saline River (KP 180.168 and KP 180.280).  All excavation activities will be contained within Enbridge's existing right-of-way (MV2013P0011) however additional off-right-of-way land is required for temporary work space to accommodate vehicle and equipment staging, temporary material storage and excavation isolation activities.  
The Project will involve a watercourse crossing and there is the potential for a channel diversion. The associated application for a Type B Water Licence is S17L1-004.


Uploaded On or After
Uploaded On or Before
Displaying 1 - 4 of 4
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
S17L1-004 S17P-005 - Revised WMP and SECP - Staff Conformity Confirmation - Feb 16_18.pdf (334.61 KB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
S17P-005 S17L1-004 - Enbridge - Spill Contingency Plan - Version 1.1 - Feb 16_18.pdf (12.6 MB)
S17P-005 S17L1-004 - Staff Confirmation of Conformity - Spill Contingency Plan - Feb 19_18.pdf (283.9 KB)
Waste Management Plan
Document Received/Sent Uploaded
S17P-005 S17L1-004 - Enbridge - Revised Waste Management Plan - Version 1.1 - Feb 15_18.pdf (3.35 MB)