Enbridge Pipelines (NW) Inc. - S17P-005
- All maps from Natural Resources Canada
200 km
Status:
Closed
Authorization:
Land Use Permit
Activity:
Pipeline
Start:
February 7, 2018
Expiry:
February 6, 2020
Staff:
Bonnie Bergsma
Enbridge Pipelines (NW) Inc. is proposing to conduct Line 21 pipeline maintenance digs within the Saline River (KP 180.168 and KP 180.280). All excavation activities will be contained within Enbridge's existing right-of-way (MV2013P0011) however additional off-right-of-way land is required for temporary work space to accommodate vehicle and equipment staging, temporary material storage and excavation isolation activities. The Project will involve a watercourse crossing and there is the potential for a channel diversion. The associated application for a Type B Water Licence is S17L1-004. |
Displaying 1 - 5 of 5
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
Enbridge - Inspector Recommendation - File Closure - Correspondence - Aug8_22.pdf (638.71 KB) | ||
S17P-005 - Inspection Report - June-27-2022.pdf (1.13 MB) | ||
S17P-005 - Inspection Report July-9-19 - Jul 15_19.pdf (1.01 MB) | ||
S17P-005 - Inspection Report - Mar 18_19.pdf (345.98 KB) | ||
S17P-005 - GNWT-Lands Inspection Report for Feb 26 2018 - Mar 22_18.pdf (562.13 KB) |