Enbridge Pipelines (NW) Inc. - S17P-005
Status:
Closed
Authorization:
Land Use Permit
Activity:
Pipeline
Start:
February 7, 2018
Expiry:
February 6, 2020
Staff:
Bonnie Bergsma
Enbridge Pipelines (NW) Inc. is proposing to conduct Line 21 pipeline maintenance digs within the Saline River (KP 180.168 and KP 180.280). All excavation activities will be contained within Enbridge's existing right-of-way (MV2013P0011) however additional off-right-of-way land is required for temporary work space to accommodate vehicle and equipment staging, temporary material storage and excavation isolation activities. The Project will involve a watercourse crossing and there is the potential for a channel diversion. The associated application for a Type B Water Licence is S17L1-004. |
Displaying 1 - 7 of 7
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
S17P-005 - 2020 Annual Report - Mar 18_21.pdf (657.27 KB) | ||
S17P-005 - Cover Letter - 2020 Annual Reports - Mar 31_21.pdf (21.66 KB) | ||
S17P-005 S17L1-004 - 2020 Annual Report - Mar 18_21.pdf (631.23 KB) | ||
S17P-005 - Enbridge Pipelines - 2019 Annual Land Use Permit Report - Mar_18_20.pdf (1.81 MB) | ||
S17L1-004 - Enbridge Pipelines Inc. - 2019 Annual Report Cover Letter - Mar_17_20.pdf (21.76 KB) | ||
S17P-005 - S17L1-004 - Review Comment Table with Letter from GNWT-ENR - Review of 2018 Annual Reports - May 7 _19.pdf (225.87 KB) | ||
S17P-005 - Line 21 Annual Land Use Permit Report - Mar 29_19.pdf (9.94 MB) |