Skip to main content

Enbridge Pipelines (NW) Inc. - S17L1-004

Enbridge Pipelines (NW) Inc. is proposing to conduct Line 21 pipeline maintenance digs within the Saline River (KP 180.168 and KP 180.280).  All excavation activities will be contained within Enbridge's existing right-of-way (MV2013P0011) however the Project will involve a watercourse crossing and there is the potential for a channel diversion. 
Additional off-right-of-way land is required for temporary work space to accommodate vehicle and equipment staging, temporary material storage and excavation isolation activities.  The associated application for a Type A Land Use Permit is S17P-005.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
8. Closure and Reclamation
Final Closure and Reclamation Plan
Document Received/Sent Uploaded
S17L1-004 S17P-005 - Board approval - CRP V1- Mar 26_18.pdf (312.49 KB)
S17L1-004 S17P-005 - Staff Report 2 - CRP V1 - Mar 26_18.pdf (486.94 KB)
S17L1-004 - Enbridge - CRP V1 - Review Summary Table and Attachments - Mar 26_18.pdf (378.97 KB)
S17L1-004 S17P-005 - Enbridge - Closure and Reclamation Plan - Version 1.0 - Feb 28_18.pdf (1.89 MB)
S17L1-004 S17P-005 - Extension of submission deadline for CRP - Feb 22_18.pdf (60.54 KB)