Enbridge Pipelines (NW) Inc. - S17L1-004

Enbridge Pipelines (NW) Inc. is proposing to conduct Line 21 pipeline maintenance digs within the Saline River (KP 180.168 and KP 180.280).  All excavation activities will be contained within Enbridge's existing right-of-way (MV2013P0011) however the Project will involve a watercourse crossing and there is the potential for a channel diversion. 
Additional off-right-of-way land is required for temporary work space to accommodate vehicle and equipment staging, temporary material storage and excavation isolation activities.  The associated application for a Type A Land Use Permit is S17P-005.


Uploaded On or After
Uploaded On or Before
Displaying 1 - 11 of 11
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
S17L1-004 - 2020 Annual Report - Mar 18_21.pdf (657.27 KB)
S17L1-004 - Cover Letter - 2020 Annual Reports - Mar 31_21.pdf (21.66 KB)
S17P-005 S17L1-004 - 2020 Annual Report - Mar 18_21.pdf (631.23 KB)
S17L1-004 - Enbridge Pipelines Inc. - 2019 Annual Report - Mar_17_20.pdf (4.91 MB)
S17L1-004 - Enbridge Pipelines Inc. - 2019 Annual Report Cover Letter - Mar_17_20.pdf (21.76 KB)
S17P-005 - S17L1-004 - Review Comment Table with Letter from GNWT-ENR - Review of 2018 Annual Reports - May 7 _19.pdf (225.87 KB)
S17L1-004 - Line 21 Annual Water Licence Report - Mar 29_19.pdf (10.13 MB)
Inspection Reports
Document Received/Sent Uploaded
S17L1-004 - S17P-005 - Inspection Report - June-27-2022.pdf (1.13 MB)
S17L1-004 - GNWT-ENR Inspection Report for Feb 26 2018 - Mar 2_18.pdf (702.75 KB)
Operations and Notifications
Document Received/Sent Uploaded
S17L1-004 - Enbridge - Notification of Diversion - Feb 16_18.pdf (62.32 KB)
Preliminary Screening
Document Received/Sent Uploaded
S17P-005 S17L1-004 - Preliminary Screening - Feb 7_18.pdf (338.01 KB)