Skip to main content

Hamlet of Tulita - S16Q-003

​The Hamlet of Tulita is planning to excavate and haul gravel from the existing Little Bear River Quarry, starting in January 2017. The intent of this project is to acquire granular material (approximately 30,000 m3 per year) for the purpose of stockpiling within the Hamlet for a number of community based infrastructure projects over the next 3-5 years. The quarry is located approximately 18 kilometers west of Tulita on the south side of the Mackenzie River, 3 km upstream of the confluence of the Little Bear River and Mackenzie River. In order to access the site, a winter access road will be constructed from the Mackenzie Valley winter road to the quarry. This is the same route used by the Department of Transportation to access the quarry from 2009 to 2013 under the Land Use Permit S08Q-009.​

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 12 of 12
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
S16Q-003 - Hamlet of Tulita - Staff Report - Feb 10_17.pdf (2.38 MB)
S16Q-003 - Hamlet of Tulita - Application Deemed Complete - Jan 3_17.pdf (297.34 KB)
S16Q-003 - Hamlet of Tulita - DRAFT Land Use Permit - Jan 3_17.pdf (514.7 KB)
S16Q-003 - Hamlet of Tulita - LUP Application Fee - Jan 3_17.pdf (52.32 KB)
S16Q-003 - Hamlet of Tulita - Cover Letter - Dec 29_16.pdf (164.87 KB)
S16Q-003 - Hamlet of Tulita - Land Use Permit Application Form - Dec 29_16.pdf (1.23 MB)
S16Q-003 - Hamlet of Tulita - SLUP Conformity - Dec 29_16.pdf (19.27 MB)
S16Q-003 - Hamlet of Tulita - Access Agreement - Dec 29_16.pdf (519.82 KB)
S16Q-003 - Hamlet of Tulita - Traditional Knowledge Study - Dec 29_16.pdf (9.73 MB)
S16Q-003 - Hamlet of Tulita - Project Area Maps - Dec 29_16.pdf (4.18 MB)
S16Q-003 - Hamlet of Tulita - Land Use Permit Application Incomplete - Dec 1_16.pdf (384.92 KB)
S16Q-003 - Hamlet of Tulita - Land Use Permit Application - Nov 29_16.pdf (7.21 MB)