Skip to main content

Department of Fisheries and Oceans - S16L8-002

​The project involves repair work to the existing federally owned steel sheet pile wharf located in Norman Wells. 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 4 of 4
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
S16L8-002 - ENR Inspection Report 5 September 2018 - Sep 5_18.pdf (3.4 MB)
S16L8-002 - Inspection Report - Sep 5_18.pdf (3.4 MB)
S16L8-002 - Canadian Coast Guard Final Inspection OCT 24th 2018 - Nov 1_18.pdf (3.4 MB)
S16L8-002 - Inspection Report - Mar 22_18.pdf (927.51 KB)