Skip to main content

Cenovus Energy Inc. - S13L1-005

Associated Land Use Permit S13A-002.  This Type B Water Licence is for exploratory oil and gas drilling and completions program within the Slater River Program Area. The proposed program includes drilling, completions (by vertical hydraulic fracturing) and testing of two vertical wells during the fall of 2013 to further validate and evaluate the Canol, Hare Indian and Bluefish Shales.  Consolidation of the existing Water Licence S11L1-003 to now be covered under this licence.

AN ADDITIONAL HUSKY LAND USE PERMIT ON EXPLORATION LICENCES 462 AND 463, S12X-006​, OUTLINES THE REQUIREMENTS OF A SURFACE AND GROUNDWATER MONITORING PLAN.  PLEASE REFER TO THIS PERMIT FOR FURTHER INFORMATION REGARDING THIS PLAN.​

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 21 of 21
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
S13L1-005 - Review Comment Table 2018-2019 AR - Dec 15_20.pdf (317.93 KB)
S13L1-005 - Annual Report 2019-2020 - Dec 14_20.pdf (25.54 MB)
S13L1-005 - 2018-19 Annual Report and Appendix ABC - Oct 16_20.pdf (16.5 MB)
S13L1-005 - 2018-19 Annual Report Appendix D - Oct 16_20.pdf (2.02 MB)
S13L1-005 - 2018-19 Annual Report Appendix E - Oct 16_20.pdf (23.16 MB)
S13L1-005 - 2018-19 Annual Report Appendix F and G - Oct 16_20.pdf (18.28 MB)
S13L1-005 - Annual Report 2018-2019 - May 22_20.pdf (60.31 MB)
S13L1-005 - 2017 Annual Reports Review Comment Table and attached letter - Dec 4_18.pdf (246.54 KB)
S13L1-005 - 2017-18 Annual Report - Nov 1_18.pdf (35.87 KB)
S13L1-005 - 2018 Summer Site Inspection Report - Nov 1_18.pdf (3.52 MB)
S13L1-005 - Husky - Slater River Drilling Program - 2016-2017 Annual Report - Oct 25_17.pdf (49.91 KB)
S13L1-005 - Husky - Slater River Drilling Program - 2017 Summer Site Inspection Report - Oct 25_17.pdf (1.97 MB)
S13L1-005 - Husky - Slater River Drilling Program - 2016 Annual Report - Oct 27_16.pdf.pdf (54.95 KB)
S13L1-005 - Husky - Slater River Drilling Program - 2016 Summer Site Inspection - Oct 27_16.pdf (6.29 MB)
S13L1-005 - Husky - Slater River Drilling Program - 2015 Annual Report - Sep 30_15.pdf (221.09 KB)
S13L1-005 - Husky - Slater River Drilling Program - 2015 Summer Site Inspection - Sep 30_15.pdf (4.04 MB)
S13L1-005 - Husky - Slater River Drilling Program - 2014 Summer Site Inspection - Oct 31_14.pdf (6.23 MB)
S13L1-005 - Husky - Slater River Drilling Program - 2014 Annual Report - Oct 15_14.pdf (239.16 KB)
S13L1-005 - Husky - Slater River Drilling Program - 2013 Summer Site Inspection - Apr 30_14.pdf (2.82 MB)
S13L1-005 - Husky - Slater River Drilling Program - 2013 Annual Report - Apr 15_14.pdf (885.34 KB)
S13L1-005 - Husky Response to Outstanding Reports - Apr 02_14.pdf (204.85 KB)