Skip to main content

Cenovus Energy Inc. - S12X-006

Type A Land Use Permit Application by Husky Oil Operations Ltd. for a Groundwater investigation program.  Husky will be drilling twenty shallow wells to a maximum depth of thirty metres or three metres into the top of the bedrock.  The information collected will be used to assess the baseline water quality in shallow surficial and deep bedrock aquifers and to assess potential bedrock aquifers as a source of water to support future operations in the area.
Click here to see map​
Uploaded On or After
Uploaded On or Before
Displaying 1 - 31 of 31
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
S12X-006 - Review Comment Table 2018-2019 AR - Dec 15_20.pdf (317.93 KB)
S12X-006 S13L1-005 - Annual Report 2019-2020 - Dec 14_20.pdf (25.54 MB)
S12X-006 - Annual Reports 2018-2019 - May 22_20.pdf (60.31 MB)
S12X-006 - Husky Oil Operations - Groundwater Investigation Program - 2014-2015 Annual Report - Sep 30_15.pdf (192.92 KB)
S12X-006 - Husky Oil Operations - Groundwater Investigation Program - 2013-2014 Annual Report - Oct 7_14.pdf (204.18 KB)
S12X-006 - 2013 Annual Report - Nov 01_13.pdf (33.14 MB)
S12X-006 - 2013 Annual Report - WL Supplement - Nov 01_13.pdf (13.14 MB)
S12X-006 - 2013 Annual Report - Mud Rotary Drilling Summary - Nov 01_13.pdf (6.94 MB)
S12X-006 - 2013 Annual Report - Shallow Investigation - Nov 01_13.pdf (6.44 MB)
Inspection Reports
Document Received/Sent Uploaded
S12X-006_Inspection_Report_June-6-2022.pdf (845.51 KB)
S12X-006 - Inspection Report - Jul 20_20.pdf (2.56 MB)
S12X-006 - Inspection Report - Aug 6_13.pdf (144.03 KB)
S12X-006 - Inspection Report - Feb 18_13.pdf (51.77 KB)
S12X-006 - Inspection Report - Jan10_13.pdf (2.05 MB)
Operations and Notifications
Document Received/Sent Uploaded
S12X-006 - Regulatory Weekly Update August 15-21_19.pdf (57.47 KB)
S12X-006 - Regulatory Weekly Update August 8-14_19.pdf (56.86 KB)
Progress Reports
Document Received/Sent Uploaded
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Report - Apr 30_15.pdf (1.05 MB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Tables - Apr 30_15.pdf (401.55 KB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Figures - Apr 30_15.pdf (17.07 MB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix A - Apr 30_15.pdf (144.56 KB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix B - Apr 30_15.pdf (7.66 MB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix C - Apr 30_15.pdf (15.88 MB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix D - Apr 30_15.pdf (6.23 MB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix E - Apr 30_15.pdf (243.48 KB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix F - Apr 30_15.pdf (5.71 MB)
S12X-006 - 2012 Slater River Surface Water Evaluation - Baseline Hydrological Assessment - May 13_13.pdf (27.27 MB)
S12X-006 - Laboratory Analyses from Water at MW-19B Location - Mar 18_13.pdf (1.4 MB)
S12X-006 - Laboratory Analyses from Water at MW-09A Location - Feb 25_13.pdf (736.36 KB)
S12X-006 - Laboratory Analyses from Water at MW-09 Location - 7am - Feb 2_13.pdf (74.66 KB)
S12X-006 - Laboratory Analyses from Water at MW-09 Location - 2pm - Feb 2_13.pdf (82.6 KB)
SNP Reports
Document Received/Sent Uploaded
S12X-006 - Disposal of Drilling Fluids and Solids to Quarry B - Lab Analysis - Mar 15_13.pdf (2.67 MB)