Skip to main content

GNWT-INF (Sahtu) - S12L8-008

The GNWT - DOT plans to replace the existing Prohibition Creek Bridge. Winter 2012-2013 development includes site preperation, embankment construction, river protection construction and earth works. The bridge structure will be completed during winter 2014. Additional information regarding bridge construction will be supplied closer to the time of construction.

The associated Land Use Permit is S12E-008​.
Click here to see map

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 6 of 6
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
S12L8-008 - 2014-2017 AR - review comment table and attachments - Oct 10_17.pdf (740 KB)
S12L8-008 - 2014-2017 Annual Reports - Aug 29_17.pdf (1.5 MB)
S12L8-008 - DOT Outstanding Reports Submission Deadline Extension Request - Mar 22_17.pdf (41.73 KB)
S12L8-008 - SLWB Letter - DOT Request Extension Approval - Mar 22_17.pdf (291.86 KB)
S12L8-008 - SLWB Letter - DOT Outstanding Reports - Dec 2_16.pdf (847.83 KB)
S12L8-008 - Annual Report 2013 - Dec 20_13.pdf (136.78 KB)