GNWT-INF (Sahtu) - S12E-009

The GNWT - DOT plans on replacing the existing Four Mile Creek Bridge with a new structure 20 metres downstream. The existing structure has been noted as damaged and unsafe.
DOT will supply plans for the dismantling and reclamation of the existing bridge at a later date.

The associated Water Licence is S12L3-009​  