Skip to main content

GNWT-INF (Sahtu) - S12E-008

The GNWT - DOT plans to replace the existing Prohibition Creek Bridge. Winter 2012-2013 development includes site preperation, embankment construction, river protection construction and earth works. The bridge structure will be completed during winter 2014. Additional information regarding bridge construction will be supplied closer to the time of construction.

The associated Water Licence is S12L8-008​  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 4 of 4
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
S12E-008 - Inspection Report - Feb 21_17.pdf (1.19 MB)
S12E-008 - inspection report - Jan 22_14.pdf (1.6 MB)
S12E-008 - Inspection Report - Dec 06_13.pdf (283.94 KB)
S12E-008 - Inspection Report - Aug 08_13.pdf (407.57 KB)