Imperial Oil Resources N.W.T. Limited - S03L1-001
Status:
Expired
Authorization:
Licence
Activity:
Industrial
Start:
August 29, 2004
Expiry:
March 24, 2015
Staff:
NA
To withdraw 3,500,000 m3 of water per year from the Mackenzie River for process cooling and injection into the oil reservoir.
Documents
- AEMP - Program (5)
- All Issuances (7)
- Annual Reports (28)
- Application and Related Docs (15)
- Assorted Management Plans (6)
- Consultations - Reviews - Work Plans (22)
- Designs and As-Builts (2)
- Inspection Reports (11)
- Modifications (5)
- Municipal Operations and Maintenance (2)
- Operations and Notifications (8)
- Progressive Reclamation (6)
- Progress Reports (14)
- Public Hearing (1)
- Security and Water Use Fees (2)
- SNP Program (3)
- SNP Reports (1)
- Spill - Contingency - Emergency Response (1)
Displaying 101 - 169 of 169
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
S03L1-001 - Upper Bosworth Creek Bridge Restoration - Mar 25_13.pdf (4.17 MB) | ||
S03L1-001 - Exposed Electrical Cable - Bear Island to Island 6 - Mar 21_13.pdf (2.32 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S03L1-001 - Staff Report 9 - Amendment to IORL SNP - May 23_07.pdf (259.88 KB) | ||
S03L1-001 - Staff Report 8 - Amendment to the Terms and Conditions Regarding Phenol Concentrations - May 04_06.pdf (2.68 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S03L1-001 - Staff Report 11 - Acute Lethality Testing Failure Nov 2,09 Backwash Pond - Dec 24_09.pdf (263.08 KB) |
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
S03L1-001 - Staff Report 13 Laboratory QAQC Manual - Oct 21_14.pdf (71.07 KB) | ||
S03L1-001 - Lab QAQC Manual - Appendix A - Maxxam Edmonton - Laboratory Accreditation - Sept 30_14.pdf (335.92 KB) | ||
S03L1-001 - Labratory QAQC Manual - Sept 30_14.pdf (3.3 MB) | ||
S03L1-001 - Laboratory QA-QC Manual - Oct 07_13.pdf (3.85 MB) | ||
S03L1-001 - Laboratory Accreditation - Oct 07_13.pdf (336.1 KB) | ||
S03L1-001 - Flowline Integrity Management Plan - Dec 9_99.pdf (920.27 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S03L1-001 - Settling Pond Cleaning Procedue - Feb 15_14.pdf (574.43 KB) | ||
S03L1-001 - Norman Wells Operations Map - Jun 29_12.pdf (572.85 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S03L1-001 - Emergency Response Plan - Jan 03_14.pdf (7.65 MB) |
7. Monitoring Programs
Document | Received/Sent | Uploaded |
---|---|---|
S03L1-001 - AEMP Final Report - Sept 1_07.pdf (5.66 MB) | ||
S03L1-001 - Progress Report for AEMP Preliminary Results from Phase 1 and 2 - Summary for SLWB - May 02_05.pdf (563.32 KB) | ||
S03L1-001 - 2002 Fish Survey- AEMP - Sept 24_03.pdf (2.55 MB) | ||
S03L1-001 - Staff Report 10 - Aquatic Effects Monitoring Plan - Apr 14_08.pdf (5.08 MB) | ||
S03L1-001 - AEMP Plain Language Document - Mar 01_08.pdf (4.47 MB) |
8. Closure and Reclamation