Skip to main content

Canadian Zinc Corporation - PC2023L8-0002

This Project is the construction, use, and closure of a winter road and all season road from the Nahanni Butte Access Road to the Prairie Creek Mine Site.

The roads cross various jurisdictions, including the Nahanni National Park Reserve (approximately km17-100; jurisdiction of Parks Canda), federal land (approximately km156-164; jurisdiction of the Mackenzie Valley Land and Water Board), and non-federal land (all other stretches of road; jurisdiction of the Mackenzie Valley Land and Water Board).

This type A water licence is for the portion of the Project in the Nahanni National Park Reserve. It is accompanied by Land Use Permit PC2014F0013.

This portion of the Project through the Nahanni National Park Reserve was previously authorized under type B water licence PC2014L8-0006.

Please note that this water licence and its associated land use permit are linked to authorizations issued by the Mackenzie Valley Land and Water Board for the same Project:

 - land use permit MV2014F0013

 - water licence MV2023L8-0002 (non-federal land), and 

 - water licence MV2023L8-0003 (federal land).


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 14 of 14
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
CZN - ASR - Type A Water Licence - Issuance Reasons for Decision.pdf (1.05 MB)
CZN - ASR - Type A Water Licence - Decision Letter.pdf (259.93 KB)
CZN - ASR - Type A Water Licence.pdf (1.06 MB)
Security and Water Use Fees
Document Received/Sent Uploaded
CZN - ASR - Closure Cost Estimates - Oct3_19.pdf (1.07 MB)
CZN – ASR – Closure Cost Estimate – NNPR Land – Phase 1 – Aug26_24.pdf (923.5 KB)
CZN – ASR – RECLAIM Closure Cost Estimate – IAB Land – Phase 2 – Aug26_24.xlsm (511.18 KB)
CZN – ASR – RECLAIM Closure Cost Estimate – IAB Land – Phase 1 – Aug26_24.xlsm (505.89 KB)
CZN – ASR – Closure Cost Estimate – Territorial Land – Phase 1 – Aug26_24.pdf (903.8 KB)
CZN – ASR – Closure Cost Estimate – IAB Land – Phase 1 – Aug26_24.pdf (836.54 KB)
CZN – ASR – RECLAIM Closure Cost Estimate – Territorial Land – Phase 1 – Aug26_24.xlsm (514.89 KB)
CZN – ASR – RECLAIM Closure Cost Estimate – Territorial Land – Phase 2 – Aug26_24.xlsm (531.72 KB)
CZN – ASR – RECLAIM Closure Cost Estimate – NNPR Land – Phase 2 – Aug26_24.xlsm (539.84 KB)
CZN – ASR – RECLAIM Closure Cost Estimate – NNPR Land – Phase 1 – Aug26_24.xlsm (533.04 KB)
SNP Program
Document Received/Sent Uploaded
CZN - ASR - SNP - QAQC Plan - Approved - Jul22_24.pdf (181.58 KB)