Skip to main content

Canadian Zinc Corporation - PC2014F0013

Construction, maintenance and use of an all weather road approximately 170 km long connecting the Prairie Creek Mine to the TetcelaTransfer Facility (TTF, Phase 1), and from the TTF to the Nahanni Butte access road which in turn joins the Liard Highway (Phase 2) to allow haulage of mineral concentrates out, and operating supplies in. Cleared normal right-of-way to be up to 20 m wide but may be up to 35 m when there are steep side-slopes, road surface width 5-8 m. Road crosses federal (IAB) Lands from approximately Km156-164. Road crosses the Nahanni National Park Reserve from approximately Km17-100 where the jurisdiction is Parks Canada. Barge landing/set-down areas both sides of Liard River.

This Permit is accompanied by Water Licence PC2014L8-0006

Please Note: This Permit and associated Water Licence are linked to the Mackenzie Valley Land and Water Board Land Use Permit MV2014F0013, Water Licence MV2014L8-0006 and Water Licence MV2019L8-0002


Uploaded On or After
Uploaded On or Before
Displaying 101 - 200 of 283
2. Initial/Renewal Application
Technical Session
Document Received/Sent Uploaded
CZN - Notice of Technical Session Agenda - Jun3-19.pdf (309.76 KB)
CZN - ASR - Technical Session Draft Agenda - May27-19.pdf (563.69 KB)
CZN - Technical Session Draft Agenda - May27-19.pdf (563.69 KB)
4. Permit Extension Request
Application and Related Docs
Document Received/Sent Uploaded
CZN - ASR - Approval - Extension to Term - Sep26_24.pdf (538.96 KB)
CZN - ASR - Permit Extension Request PC - Jul16_24.pdf (1.25 MB)
5. Reports and Studies
Designs and As-Builts
Document Received/Sent Uploaded
CZN - ASR - Phase 2 - Mapbook - KM 0-103 - Nov16_23.pdf (13.92 MB)
CZN - ASR - Phase 2 - Mapbook - KM 103-170 - Nov16_23.pdf (11.69 MB)
CZN - ASR - As Built Construction 25.5 to 27.0 - Mar 7_23.pdf (11.1 MB)
CZN - Design Phase 1 Correspondence - PC Requirements - Dec1_22.pdf (188.75 KB)
CZN - DCP Phase 1 - Updated - Parks Approval - Oct31_22.pdf (709.22 KB)
CZN - DCP Phase 1 Appendix B - Updated - Oct28_22.pdf (50.96 MB)
CZN - DCP Phase 1 CZN Response to Directives - Nov8_22.pdf (181.89 KB)
CZN - DCP Phase 1 Directive Correspondence - Nov10_22.pdf (192.21 KB)
CZN - DCP Phase 1 - Updated - Oct28_22.pdf (49.09 MB)
CZN - ASR - ICRP - ITRP Acceptance Letter for DCP - Aug22_22.pdf (694.04 KB)
CZN - ASR - Winter Road Design and Construction Plan Updated - Aug22_22.pdf (46.83 MB)
CZN - DCP Phase 1 - Version 1 - Correspondence - Jan17_22.pdf (192.02 KB)
CZN - ITRP Acceptance Letter - Detailed Construction Plan - Jan17_22.pdf (676.53 KB)
Inspection Reports
Document Received/Sent Uploaded
CZN - Phase 1 Surveillance Report - Apr27_23.pdf (7.18 MB)
CZN - Phase 1 Surveillance Report - Apr23_23.pdf (455.72 KB)
CZN - Phase 1 Surveillance Report - May9_23.pdf (3.65 MB)
CZN - Commitments and Directives - Mar31_23.xlsx (70.22 KB)
CZN - Correspondence Re Response to CDR Table - Apr15_23.pdf (292.92 KB)
CZN - Correspondence Re Conditions for Extension of Drilling Activities Beyond April 15 - Mar31_23.pdf (221.87 KB)
CZN - Commitments and Directives - CZN responses and PC comments - Apr15_23.xlsx (74.71 KB)
CZN - Phase 1 Surveillance Report - Apr17_23.pdf (3.6 MB)
CZN - Phase 1 Surveillance Report - May4_23.pdf (8.61 MB)
CZN - ASR - Phase 1 Surveillance Report - Mar19_23.pdf (3.74 MB)
CZN - ASR - Phase 1 Surveillance Report - Mar24_23.pdf (8.82 MB)
CZN - ASR - Surveillance Report - April 6, 2023 - Apr18_23.pdf (6.1 MB)
CZN - ASR - Surveillance Report - April 1 and April 2, 2023 - Apr18_23.pdf (2.42 MB)
CZN - ASR - Surveillance Report - March 9, 2023 - Apr3_23.pdf (4.47 MB)
CZN - ASR - Surveillance Report - March 11, 2023 - Apr3_23.pdf (7.75 MB)
CZN - ASR - Surveillance Report - March 17, 2023 - Apr3_23.pdf (11.27 MB)
CZN - ASR - Surveillance Report - March 26, 2023 - Apr3_23.pdf (10.94 MB)
CZN - ASR - Surveillance Report - March 3, 2023 - Mar16_23.pdf (5.79 MB)
CZN - ASR - Surveillance Report - March 5, 2023 - Mar16_23.pdf (5.94 MB)
CZN - Phase 1 Surveillance Report - Feb20_23.pdf (4.64 MB)
CZN - Phase 1 Commitment and Directives Report - Feb22_23.pdf (565.9 KB)
CZN - Phase 1 Surveillance Report - Feb17_23.pdf (5.33 MB)
CZN Phase 1 Commitment and Directives Report - Feb13_23.pdf (480.88 KB)
CZN Phase 1 Commitment and Directives Report - Jan26_23.pdf (563.12 KB)
CZN - Phase 1 Surveillance Report - Dec15_22.pdf (2.31 MB)
CZN - Phase 1 Surveillance Report - Feb9_23.pdf (7.86 MB)
CZN - Phase 1 Surveillance Report - Jan13_23.pdf (2.76 MB)
CZN - Phase 1 Surveillance Report - Jan20_23.pdf (2.55 MB)
CZN - Phase 1 Surveillance Report - Jan28_23.pdf (2.81 MB)
CZN - Phase 1 Surveillance Report - Nov17_22.pdf (2.23 MB)
CZN - Phase 1 Surveillance Report - Nov22-23_22.pdf (2.07 MB)
CZN - Phase 1 Surveillance Report - Feb2_23.pdf (4.18 MB)
CZN - Phase 1 Surveillance Report - Jan15_23.pdf (3.4 MB)
Operations and Notifications
Document Received/Sent Uploaded
CZN - ASR - Phase 1 Winter Road - Drilling Locations - Feb4_25.pdf (833.59 KB)
CZN - ASR - Parks Canada Correspondence Re Drilling at Tetcela - Stop Work Order and Resume - Mar23_23.pdf (2.44 MB)
CZN - ASR - Parks Canada Email to CZN - Unapproved Work in Water - Mar18_23.pdf (775.13 KB)
CZN - ASR - Parks Canada Deactivation Directives - Mar21_23.pdf (119.71 KB)
CZN - ASR - Parks Canada Info Request for Deactivation Plan and CZN Responses - Mar21_23.pdf (695.71 KB)
CZN - ASR - Winter Road Deactivation KP25 Crossing - Apr1_23.pdf (10.41 MB)
CZN - ASR - Winter Road Deactivation KP28 Non-Typical - Mar31_23.pdf (6.49 MB)
CZN - ASR - Winter Road Deactivation Plan KP17 to 40 - Mar22_23.pdf (11.76 MB)
CZN - ASR - Winter Road Deactivation Plan KP17 to 40 - May9_23.pdf (15.66 MB)
CZN - ASR - Winter Road Deactivation Plan KP40 to 101 - Mar22_23.pdf (3.86 MB)
CZN - ASR - Winter Road Deactivation Plan KP40 to 101 - May10_23.pdf (4.83 MB)
CZN - ASR - CZN Response to Parks Directive NAH2023-001 - Mar1_23.pdf (13.96 MB)
CZN - ASR - CZN Geotechnical Investigation Details - Mar1_23.pdf (7.95 MB)
CZN - ASR - Email Re Info Request for Geotechnical Investigations - Mar16_23.pdf (998.86 KB)
CZN - ASR - Email Re Info Request for Geotechnical Investigations - Mar23_23.pdf (1.01 MB)
CZN - ASR - PC Email Geotechnical Information Request - Dec1_22.pdf (843.58 KB)
CZN - ASR - Mitigation and Remediation Plan for Unapproved Non-Typical Winter Road - Mar4_23.pdf (5.8 MB)
CZN - ASR - Parks Canada Comments on Deactivation at KP25 and 28 - Apr6_23.pdf (799.5 KB)
CZN - ASR - Winter Road Deactivation KP25 Crossing - Mar31_23.pdf (6.88 MB)
CZN - ASR - Parks Canada Acknowledgement of Deactivation Plans - Jun21_23.pdf (850.33 KB)
CZN - ASR - Parks Canada Comments for Deactivation Plans and Scouten Responses - May9_23.pdf (502.48 KB)
CZN - ASR - Comments and Responses - Deactivation Plan - May8_23.xlsx (44.15 KB)
CZN - ASR - Parks Canada Directive NAH2023-001 - Feb22_23.pdf (1.34 MB)
CZN - ASR - Parks Canada Response to CZN - Directive NAH2023-001 - Mar2_23.pdf (1.39 MB)
CZN - ASR - Partial Approval with Conditions of Geotechnical Work - Mar10_23.pdf (847.93 KB)
CZN - ASR - Cutline Access Locations Geotechnical Details - Mar14_23.pdf (8.71 MB)
CZN - ASR - CZN Email Provision of Geotechnical Details - Mar1_23.pdf (863.8 KB)
CZN - ASR - Request to Change Annual Report Submision Date - Mar17_23.pdf (165.22 KB)
PC - ASR - Notification of Commencemet Staging Area - Sep20_22.pdf (333.34 KB)
Other
Document Received/Sent Uploaded
CZN - ASR - Geotechnical Investigation Report Phase 1 - Jun22_23.pdf (2.29 MB)
CZN - ASR - Parks Canada Review of Geotechnical Investigation Report - Jun23_23.pdf (663.96 KB)
CZN - ASR - Updated Slope Stability Analysis - Mar27_23.pdf (2.68 MB)
CZN - ASR - Winter 2021-22 Construction Deferral - Dec20_21.pdf (282.32 KB)
SNP Reports
Document Received/Sent Uploaded
CZN - ASR - SNP Reports - Response to Conformity Commentnts on 2022 and 2023 SNP Reports - Feb27_24.pdf (203.27 KB)
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
CZN - ASR - Traffic-Plan-v3-Revisions-Required - Oct31_24.pdf (134.11 KB)
CZN - Rare Plant Management Plan V3.pdf (135.74 KB)
CZN - Cultural Heritage Protection Plan V2.pdf (147.95 KB)
CZN - ASR - Traffic Plan V3 - Apr30_24.pdf (4.59 MB)
CZN - ASR - Explosives Managment Plan V3- Not approved - Apr2_24.pdf (154.16 KB)
CZN - Rare Plant Management Plan V3- Revisions Required.pdf (122.54 KB)
CZN - Cultural Heritage Protection Plan V2-revisions required.pdf (112.62 KB)
CZN - ASR - Phase 2 - Explosives Management Plan - Version 3 - Nov14_23.pdf (4.06 MB)
CZN - ASR - Baseline and Monitoring Requirements for Phase 2 - June 15_23.msg (314.5 KB)
CZN - ASR - Parks Canada Email to CZN Re Phase 1 Reporting Requirements - June 6_23.pdf (749.58 KB)
CZN - ASR - Monitoring Requirements for Phase 2 - Fish and Fish Habitat - June 21_23.msg (190 KB)
CZN - All Season Road - Geochemical Verification Program - Revision 7 - Sept 1_22.pdf (10.34 MB)
CZN - All Season Road - Decision Letter - Explosives Management Plan - Approved - Sept 29_22.pdf (515.92 KB)
CZN - Decision Letter - Geochemical Verification Plan - Approved - Oct 28_22.pdf (542.46 KB)
CZN - All Season Road - Permafrost Management Plan - Revision 7 - Feb 18_22.pdf (1.94 MB)