Skip to main content

GNWT-ECC - MV2024X0024

Continue the care and maintenance and remediation and monitoring activities at the former Checkpoint Highway Maintenance Facility and the Landfarm Treatment Facility.

Accompanied by Licence MV2024L8-0007.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 16 of 16
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
GNWT-ECC - Checkpoint - Draft Permit Prepared by Staff for Review.pdf (329.2 KB)
GNWT-ECC - Checkpoint - LUP and WL Renewal Request Letter - FINAL - Jul2_24.pdf (239.82 KB)
GNWT-ECC - Checkpoint - Spill Contingency Plan V3 - Jul2_24.pdf (810.78 KB)
GNWT-ECC - Checkpoint - Waste Management Plan V3 - Jul2_24.pdf (527.26 KB)
GNWT-ECC - Checkpoint - Groundwater Monitoring and Surface Water Management Plan V4 - Jul2_24.pdf (8.95 MB)
GNWT-ECC - Checkpoint - Closure and Reclamation Plan V1.1 - Jan 22 2020 - Jul2_24.pdf (12.27 MB)
GNWT-ECC - Checkpoint - Soil Treatment Facility Operations and Maintenance Plan V2.1 - Jul2_24.pdf (4.23 MB)
GNWT-ECC - Checkpoint - LUP Renewal Application V1.1 - Jul2_24.pdf (618.13 KB)
GNWT-ECC - Checkpoint - Project Summary - Jul2_24.pdf (300.21 KB)
GNWT-ECC - Checkpoint - LUP and WL Renewal Engagement Log V1.1 - Jul2_24.pdf (14.75 MB)
GNWT-ECC - Checkpoint - Engagement Plan V2.1 - Jul2_24.pdf (164.35 KB)
GWNT-ECC - Checkpoint - Letter of Eligibility for the Renewal of LUP MV2017X0020 - Jul2_24.pdf (264.5 KB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
GNWT-ECC - Checkpoint – Draft Conditions - Review Summery Table - Dec5_24.pdf (636.12 KB)
GNWT-ECC - Checkpoint - Application - Review Summery Table - Dec5_24.pdf (202.18 KB)
Further Study Requested Sec. 22.2.b
Document Received/Sent Uploaded
GNWT-ECC - Checkpoint – Notification - Timeline Pause - Aug8_24.pdf (199.35 KB)
Preliminary Screening
Document Received/Sent Uploaded
GNWT-ECC - Checkpoint - Notification - Preliminary Screening Determination - Dec5_24.pdf (200.1 KB)