Skip to main content

GNWT-INF - MV2024L8-0004

​GNWT Department of Infrastructure is planning the design and replacement of the Jean Marie River Bridge. The Project involves the replacement of the existing Jean Marie River Bridge with a new single span bridge. Activities involved in replacing the existing bridge includes construction of a temporary detour bridge, demolition, disposal and reclamation of the existing bridge, and construction of the new single span bridge.


Uploaded On or After
Uploaded On or Before
Displaying 1 - 3 of 3
6. Management Plans
Sediment and Erosion Control
Document Received/Sent Uploaded
GNWT-INF - Jean Marie River Bridge - Sediment and Erosion Control Plan V1.1 - Oct4_24.pdf (15.69 MB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
GNWT-INF - Jean Marie River Bridge - Spill Contingency Plan V1.1 - Oct4_24.pdf (6.15 MB)
Waste Management Plan
Document Received/Sent Uploaded
GNWT-INF - Jean Marie River Bridge - Waste Management Plan V1.1 - Oct 4_24.pdf (5.02 MB)