GNWT-INF - MV2024L8-0004
Status:
Issued
Authorization:
Licence
Activity:
Miscellaneous
Start:
September 6, 2024
Expiry:
September 5, 2029
Staff:
Tyree Mullaney
GNWT Department of Infrastructure is planning the design and replacement of the Jean Marie River Bridge. The Project involves the replacement of the existing Jean Marie River Bridge with a new single span bridge. Activities involved in replacing the existing bridge includes construction of a temporary detour bridge, demolition, disposal and reclamation of the existing bridge, and construction of the new single span bridge.
Displaying 1 - 3 of 3
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - Jean Marie River Bridge - Sediment and Erosion Control Plan V1.1 - Oct4_24.pdf (15.69 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - Jean Marie River Bridge - Spill Contingency Plan V1.1 - Oct4_24.pdf (6.15 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - Jean Marie River Bridge - Waste Management Plan V1.1 - Oct 4_24.pdf (5.02 MB) |